Port Environment

Sl. No. Date of Issue Subject
Year – 2023    
1 10/02/2023 Point-wise Compliance of the conditions stipulated in Environmental Clearance granted by MoEF&CC, GoI vide letter dated 10/10/2017 for the project “Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch-Gujarat by M/s Deendayal Port Authority.
2 10/02/2023 Point-wise Compliance of the conditions stipulated in Consent to Establish (NOC) for the project “Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch, Gujarat-370 201 by M/s Deendayal Port Authority.
3 10/02/2023 Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M/s. Kandla Port Trust (Now Deendayal Port Authority)– Six monthly compliance report of conditions stipulated in CRZ Recommendations reg
4 10/02/2023 Setting up of Single Point Mooring (SPM) and Allied Facilities off-Veera in Gulf of Kutch for handling Crude oil on BOT basis – Six Monthly compliance Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet reg.
5 11/02/2023 Compliance of conditions stipulated in Consent to Establish (NOC) issued by Gujarat Pollution Control Board, GoG for the proposal of “Construction of 13th to 16th Cargo Berths” at Deendayal Port Authority (Kandla Port Trust).
6 11/02/2023 Construction of 13th to 16th Cargo Berth at Deendayal port Authority – Point wise Compliance to the stipulations in CRZ Recommendations reg
7 11/02/2023 Compliance of conditions stipulated in Environmental & CRZ Clearance granted by the MoEF&CC, GoI for “Construction of 13th to 16th Cargo Berths” at Deendayal Port Authority (Erstwhile: Deendayal Port Trust) .
8 11/02/2023 Environment & CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority – Environmental & CRZ Clearance – Submission of Information reg.
9 02/05/2023 “Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited
10 02/05/2023 Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited” – Pointwise Compliance of the conditions stipulated in NOC (CTE- 74334) issued by GPCB
11 02/05/2023 Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited” Environmental & CRZ Clearance – Pointwise Compliances of the conditions stipulated in the EC&CRZ Clearance and Monitoring Report in Datasheet.
12 02/05/2023 Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Pot Trust Limited”- Pointwise Compliances of the conditions stipulated in CRZ Recommendations.
13 23/05/2023 Development of Integrated facilities (Stage-II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. (1. Setting up of Oil Jetty No.7. 2. Setting up of Barge jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) – Pointwise Compliances of the conditions stipulated in CRZ Recommendation.
14 23/05/2023 Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty No. 7 2. Setting up of Barge Jetty at Jafrabadi 3. Setting up of Barge port at Veera 4. Administrative office building at Tuna Tekra 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust)- Pointwise Compliances of the conditions stipulated in the EC&CRZ Clearance and Monitoring Report in Datasheet
15 23/05/2023 Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty No. 7 2. Setting up of Barge Jetty at Jafrabadi 3. Setting up of Barge port at Veera 4. Administrative office building at Tuna Tekra 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) – Pointwise Compliance of the conditions stipulated in NOC/CTE iSSued by GPCB
16 23/05/2023 Creation of water front facilities (Oil Jetties 8, 9, 10 & 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust)- Submission of Point-wise Compliance of Conditions stipulated in the NoC/CTE
17 23/05/2023 CRZ Clearance for “Creation of water front facilities (oil Jetties 8, 9, 10 & 11) and
development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Trust”- Submission of six-monthly Compliances of the stipulated conditions in CRZ Recommendations.
18 23/05/2023 Creation of water front facilities (0il Jetties 8, 9, 10 & 11) and development of
land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Trust – Environmental & CRZ Clearance Submission of Six Monthly Compliance report for the stipulated conditions in EC&CRZ Clearance and Monitoring Report in Data sheet.
19 19/06/2023 Development of Plots for Construction of Warehouses/Godowns (Stage II) at Kandla, Gujarat by Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Compliance. Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet (Period up to November, 2022) reg.
20 19/06/2023 Development of Plots for Construction of Warehouses/Godowns (Stage II) at Kandla, Gujarat by Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Compliance report of NOC/CTE(Period up to November, 2022) reg.
21 19/06/2023 Submission of Annual Return of Hazardous waste in format form IV and V for the financial year 2022-23 reg.
22 19/06/2023 Development of Plots for Construction of Warehouses/ Godowns (Stage II) at Kandla,Gujarat by Deendayal Port Authority (Erstwhile: Deendayal Port Trust) Point wise Compliance to the stipulations in CRZ Recommendation (Period up to November 2022) reg.
23 04/08/2023 Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch-Gujarat by M/s Deendayal Port Authority – Submission of Six-monthly Compliance report for the project reg.
24 04/08/2023 Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M/s. Kandla Port Trust (Now Deendayal Port Authority)- Six monthly compliance report of Conditions stipulated in CRZ Recommendations reg.
25 04/08/2023 Setting up of Single Point Mooring (SPM) and Allied Facilities off-Veera in Gulf of Kutch for handling Crude oil on BOT basis – Six Monthly compliance Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet reg.
26 04/08/2023 Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch, Gujarat-370 201″ by M/s Deendayal Port Authority- Submission of Six-monthly Compliance report for the project reg.
27 07/08/2023 Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat Gujarat – Submission of Compliance Report of Conditions Stipulated in CRZ recommendation reg.
28 07/08/2023 Bifurcation (600 mt water front out of total 4800 mt) of Environmental and CRZ clearance issued to M/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Sura, Gujarat – Submission of Compliance Report of Stipulated Conditions in EC & CPZ Clearance and Monitoring datasheet reg.
29 07/08/2023 Consolidated Consent & Authorization (Renewal) order no AWH-110594 date of issue
22/01/2021 (GPCB ID 28494) – Submission of compliance report of stipulated conditions mentioned in the CCA Order issued by the GPCB reg.
30 14/08/2023 Construction of 13th to 16th Cargo Berths at Kandla” by M/s Deendayal Port Authority(Erstwhile Deendayal Port Trust) – Point wise Compliance to the stipulations in CCRZ Recommendations reg.
31 14/08/2023 Construction of 13th to 16th Cargo Berths at Kandla” by M/s Deendayal Port Authority(Erst while Deendayal Port Trust) – Compliance Report of conditions stipulated in Environmental & CRZ Clearance and Monitoring Report in Data Sheet reg.
32 12/09/2023 Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat – Pointwise Compliance of the conditions stipulated in the EC&CRZ Clearance and Monitoring Report in Datasheet reg.
33 12/09/2023 Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited” – Pointwise Compliance of the conditions stipulated in NOC (CTE- 74334) issued by GPCB reg.
34 12/09/2023 Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited” – Pointwise Compliances of the conditions stipulated in CRZ Recommendations reg.
35 12/09/2023 Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB reg.
36 12/09/2023 Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat Submission of Point-wise Compliances of the stipulated condition in CRZ Recommendations reg.
37 12/09/2023 Development of 7 Integrated Facilities (stage I) within the existing Kandla port Trust limit at District Kutch (Gujarat) by M/s Kandla Port Trust Limited” – Environmental & CRZ Clearance – Pointwise Compliances of the conditions stipulated in the EC&ÇRZ Clearance and Monitoring Report in Datasheet reg.
38 18/09/2023 CRZ Clearance for “Creation of water front facilities (Oil Jetties 8, 9, 10 & 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M/s Deendayal Port Authority” – Submission of six – monthly Compliances of the stipulated conditions in CRZ Recommendations req.
39 18/09/2023 Creation of water front facilities (0il Jetties 8, 9, 10 & 11) and developnent of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidharm, Kutch, Gujarat by M/s Deendayal Port Trust – Environmental & CRZ Clearance – Submission of Six Monthly Compliance report for the stipulated conditions in EEC&CRZ Clearance and Monitoring Report in Data sheet reg.
40 18/09/2023 Creation of water front facilities (Oil Jetties 8, 9, 10 & 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidharn, Kutch, Gujarat by 4/5 Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Submission of Point-wise Compliance of Conditions stipulated in the NOC/CTE reg.
Year – 2022    
1 03/02/2022 Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M/s. Kandla Port Trust (Now Deendayal Port Authority)–Compliance of the stipulated conditions in CRZ Recommendations reg. Report no :EG/WK/5202(D)/ Part (CRZ-2) 134-1
2 03/02/2022 Setting up of Single Point Mooring (SPM) and Allied Facilities off-Veera in Gulf of Kutch for handling Crude oil on BOT basis – Six Monthly compliance Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet reg.
3 09/02/2022 Creation of Water Front Facilities (Oil Jetties 8, 9, 10 & 11) and Development of land of area 554 acres for associated facilities for storage, at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority- Submission of Six Monthly Compliance Report of Stipulated conditions mentioned NOC/CTE reg.
4 09/02/2022 Creation of Water Front Facilities (Oil Jetties 8, 9, 10 & 11) and Development of land of area 554 acres for associated facilities for storage, at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority- Submission of Six Monthly Compliance Report of Stipulated conditions in CRZ recommendation.
5 09/02/2022 Creation of Water Front Facilities (Oil Jetties 8, 9, 10 & 11) and Development of land of area 554 acres for associated facilities for storage, at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority- Submission of Six Monthly Compliance Report of Stipulated conditions in EC & CRZ Clearance reg.
6 12/02/2022 Development of Integrated facilities (Stage II) within the existing Deendayal Port Authority (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty No. 7 2. Setting up of Barge Jetty at Jafrabadi 3. Setting up of Barge port at Veera 4. Administrative office building at Tuna Tekra 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Kandla Port Trust)– Six Monthly compliance Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet reg
7 12/02/2022 Point-wise Compliance Status Report for CRZ Cleaarnce for Developing Integrated facilities (Phase-II)- within the existing Kandla Port at Kandla Dist: Kutch by M/s. Kandla Port Trust – Regarding.
8 12/02/2022 Development of Integrated facilities (Stage-II) within the existing Deendayal Port Authority (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. (1. Setting up of Oil Jetty No.7. 2. Setting up of Barge jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Kandla Port Trust)
9 12/02/2022 CRZ Clearance for proposed for “Developing Integrated facility (Phase-I) – Remaining three facilities within the existing Kandla Port at Kandla, Dist.: Kutch by M/s Deendayal Port Authority (Erstwhile: Kandla Port Trust) – Compliances of the stipulated conditions in CRZ Recommendations reg
10 12/02/2022 Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile : Kandla Port Trust) at Gandhidham, Kutch, Gujarat – Environmental & CRZ Clearance – Submission of compliance report of stipulated conditions reg.
11 15/02/2022 Environment & CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority – Environmental & CRZ Clearance – Submission of Information reg.
12 15/02/2022 Environment & CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority- Compliance of Conditions mentioned in the NoC/CTE reg
13 15/02/2022 Environment & CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority – Environmental & CRZ Clearance – Submission of Information reg
14 23/02/2022 Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch-Gujarat by M/s Kandla Port Trust- Compliance Report of conditions stipulated in Environmental Clearance
15 23/02/2022 Compliance report of Consent to Establish (NOC) for Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch, Gujarat-370 201 by M/s Deendayal Port Authority.
16 05/04/2022 Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ Clearance issued to M/s ESSAR Bulk Terminal Limited for expansion of Port facility at Hazira, Surat, Gujarat- Transfer of Environmental and CRZ Clearance – Reg.
17 06/07/2022 Setting up of Single Point Mooring (SPM) and Allied Facilities off-Veera in Gulf of Kutch for handling Crude oil on BOT basis – Six Monthly compliance Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet reg
18 06/07/2022 Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M/s. Kandla Port Trust (Now Deendayal Port Trust)–Compliance of the stipulated conditions in CRZ Recommendations reg.
19 07/07/2022 Submission of Annual Returns Hazardous waste in format Form IV for the financial Year 2021-22.
20 07/07/2022 Submission of Environmental Statement in format Form V for the financial year 2021-22.
21 11/07/2022 Environment & CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port authority – Compliance of Conditions mentioned in the NoC/CTE reg
22 11/07/2022 Environment & CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port Trust – Environmental & CRZ Clearance – Submission of Information reg
23 11/07/2022 Six monthly compliance report of CRZ Recommendation for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M/s Deendayal Port Authority.
24 11/07/2022 Creation of Water Front Facilities (Oil Jetties 8, 9, 10 & 11) and Development of land of area 554 acres for associated facilities for storage, at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority – Submission of Six Monthly Compliance Report of Stipulated conditions in CRZ recommendation
25 11/07/2022 Creation of Water Front Facilities (Oil Jetties 8, 9, 10 & 11) and Development of land of area 554 acres for associated facilities for storage, at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority – Submission of Six Monthly Compliance Report of Stipulated conditions in EC & CRZ Clearance
26 11/07/2022 Creation of Water Front Facilities (Oil Jetties 8, 9, 10 & 11) and Development of land of area 554 acres for associated facilities for storage, at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority – Submission of Six Monthly Compliance Report of Stipulated conditions mentioned NOC/CTE reg
27 11/07/2022 Compliance report of Consent to Establish (NOC) for Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch, Gujarat-370 201 by M/s Deendayal Port Authority.
28 11/07/2022 Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch-Gujarat by M/s Kandla Port Trust- Compliance Report of conditions stipulated in Environmental Clearance (EC) reg.
29 13/07/2022 CRZ Clearance for proposed for “Developing Integrated facility (Phase-I) – Remaining three facilities within the existing Kandla Port at Kandla, Dist.: Kutch by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Compliances of the stipulated conditions in CRZ Recommendations reg.
30 13/07/2022 Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat – Environmental & CRZ Clearance – Submission of compliance report of stipulated conditions reg.
31 13/07/2022 Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority ( Erstwhile : Deendayal Port Trust) at Gandhidham, Kutch, Gujarat – Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB reg
32 14/07/2022 Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty No. 7 2. Setting up of Barge Jetty at Jafrabadi 3. Setting up of Barge port at Veera 4. Administrative office building at Tuna Tekra 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Trust (Erstwhile Kandla Port Trust)– Six Monthly compliance Report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet reg
33 14/07/2022 Development of Integrated facilities (Stage II) within the existing Deendayal Port Authority (Erstwhile Deendayal Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty No. 7 2. Setting up of Barge Jetty at Jafrabadi 3. Setting up of Barge port at Veera 4. Administrative office building at Tuna Tekra 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Kandla Port Trust)Submission of Compliance report of stipulated conditions mentioned in the CTE issued by GPCB reg
34 14/07/2022 Development of Integrated facilities (Stage-II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. (1. Setting up of Oil Jetty No.7. 2. Setting up of Barge jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) Compliances of the stipulated conditions in CRZ Recommendations reg
35 14/07/2022 Consolidated Consent & Authorization (Renewal) order no AWH-110594 date of issue 22/01/2O21 (GPCB ID 28494) – Submission of compliance report of stipulated conditions mentioned in the CCA Order issued by the GPCB reg
36 22/07/2022 Construction of 13th to 16th Cargo Berth at Kandla Port by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB.
37 22/07/2022 Construction of 13th to 16th Cargo Berth at Kandla Port by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Compliances of the stipulated conditions in CRZ Recommendations.
38 22/07/2022 Construction of 13th to 16th Cargo Berth at Kandla Port by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Six monthly compliance report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet.
39 17/08/2022 Development of plots for construction of Liquid Storage Tank Farm at Kandla, Gujarat by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Point wise compliance report of conditions stipulated in Environmental & CRZ Clearance & Monitoring Report in Data Sheet reg.
40 17/08/2022 Development of plots for construction of Liquid Storage Tank Farm at Kandla, Gujarat by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Point wise compliance report of conditions stipulated in CRZ recommendation reg..
41 17/08/2022 Development of plots for construction of Liquid Storage Tank Farm at Kandla, Gujarat by M/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) – Point wise compliance report of conditions stipulated in NoC issued by GPCB reg..
42 23/08/2022 Proposed Smart Industrial Port City (SIPC) at Green Field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch — Gujarat by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust)-Point wise compliance report of conditions stipulated in Environmental Clearance & Monitoring Report in Data Sheet reg.
43 23/08/2022 Proposed Smart Industrial Port City (SIPC) at Green Field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch — Gujarat by M/s Deendayal Port Authority (Erstwhile Deendayal Port Trust)-Point wise compliance report of conditions stipulated in NOC issued by GPCB reg..
Year – 2020    
1 18/02/2020 Development of 3 remaining integrated facilities (Stage I) within the existing Kandla Port Trust at Gandhidham, Kutch, Gujarat by M/s Kandla Port Trust – Environmental & CRZ Clearance – reg.
2 19/02/2020 Development of Integrated facilities (Stage-II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. (1. Setting up of Oil Jetty No.7. 2. Setting up of Barge jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M/s Deendayal Port Trust (Erstwhile Kandla Port Trust) – Environmental & CRZ Clearance – reg.
3 24/11/2020 Expansion of port by creation of water front facilities (Oil Jetties 8,9,10 & 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kachchh (Gujarat) by M/s Deendayal Port Trust (formerly known as Kandla Port Trust) – Environmental and CRZ Cllearance.
Year – 2016    
1 20/12/2016 Development of 7 Integrated facilities (stage-l) within the existing Kandla Port