| Sr.No | Description | Present status |
| 1 | Development, Operation & Maintenance of Berth No. 15 & 16 on DBFOT Basis under PPP Mode | Under RFQ Stage |
| 2 | Development, Operation & Maintenance of Berth-13 on DBFOT basis under PPP Mode | Project is under Conditions Precedent Compliance Stage |
Civil Engineering
| Sr.No | Name of the Work | Present Status |
| 1 | CAPITAL DREDGING OF COMMON APPROACH CHANNEL FOR TUNA TEKRA CONTAINER TERMINAL | Final technical evaluation report submitted by M/s IIT-M on 01/06/2026 and technical evaluation is in progress, security clearance is awaited from the ministry. |
| 2 | Construction of Oil jetty no.9 at Kandla | LoA was issued on 31.03.2026 to M/s. AIPL-NIPL JV. |
| 3 | Construction of Oil jetty no.10 at Kandla | LoA was issued to M/s. AIPL-NIPL JV. |
| 4 | Construction of Oil jetty no.11 at Kandla | LoA was issued to M/s. AIPL-NIPL JV. |
| 5 | Providing common approach road connectivity for proposed green hydrogen plots at Padana (Phase-I) | Tender opened on 15.06.2026. |
| 6 | Providing common approach road connectivity for proposed green hydrogen plots at Kandla (Phase-I) | Tender opened on 16.06.2026. |
| 7 | Construction of approach road for the proposed Veera Barge Jetty (Phase-I) | Tender will open on 19.06.2026. |
| 8 | Construction of pipe trestle from oil jetty no.8 to land fall point at Kandla phase-1 | |
| 9 | Construction of Service Road From Village Jungi/Vandhiya to Village Veera for Demarcation and safeguard of DPT Land Bifurcating State Government Land (Phase-I) | Revised estimate & DTP was prepared and the same was technically checked by design section. Further, the same was forwarded to PMU for checking. |
| 10 | Construction of Road Over Bridge (RoB) including Roads & allied facilities at Tuna-Tekra | Proposal for estimate & DTP (EPC) amounting to Rs.464 Cr. and Rs.374 Cr. Was concurred by finance department & file is under approval of Competent Authority. |
| 11 | Construction of Administrative Office (Port Operational) Building at Tuna Tekra | Technical consultant i.e. M/s. Geo designs submitted block cost estimate of Rs.38 Cr. Which was technically checked by design section. Accordingly, Standing Committee Note was prepared & forwarded for finance checking. |
| 12 | Construction of pipe trestle from oil jetty no.8 to land fall point at Kandla Phase-II | ~The block cost estimate of Rs. 99.294 Cr. was prepared & the same was technically checked by design section. |
| 13 | Development of 6 KM Waterfront Outside Kandla Creek into a 135 MMTPA Capacity Cargo Handling Modern Facility | PIB proposal was forwarded to MoPS&W for approval & the same is in progress. ~Preparation of DPR is verge of completion by Technical Consultant IIT-M, Chennai. Further, IRR/Financial Model was forwarded to finance department for scrutiny on 25.05.2026 |
| 14 | Development of Container Terminal at Tuna-Tekra “Common Road connectivity from Take off point up to back up area” Stage-II | L1 bidder unwilling due to geopolitical issues; draft letter sent for approval to seek consent for EMD forfeiture as per tender condThe L1 bidder has expressed unwillingness to proceed with the acceptance of bid and refund of EMD due to ongoing geo-political issues. Division has send a draft letter for the approval of CA for asking the consent of bidder to forfeit the EMD as per the tender Conditionitions. |
| 15 | Upgradation of backup area of Cargo Berth No.15 inside Cargo Jetty area | Sent for approval of L1 offer. |
| 16 | Development of Open Plot in place of Godown No.8 to 14 renamed as “Construction of New Godowns in place of Dismantled Godown No G8 to G16” | Work order pending due to non-availability of site. |
| 17 | Development of Rail Siding in between proposed Dome Shaped Godown Inside cargo jetty area | Tender opened on 21/04/2026; proposal for opening the price bid under approval stage. |
| 18 | Development of car carrier facility at Kandla | Detail estimate concurred by finance and under approval of competent authority. |
| 19 | Scaling up the 1 MW Plant by additional 5 MW, Green Hydrogen Plant in DPA with capabilities to further enhance up to 10 MW in future by using Common Infrastructure Facilities – Civil Work | Technical Bid Opened on 12/05/2026. Minutes under finalization. |
| 20 | Construction of 5 TPD Green Bio-Methanol plant at Kandla – Civil Works | Block Estimate prepared and submitted for SIC approval. |
| 21 | Construction of Mooring Launch Floating Pontoon and connecting walkway at Oil Jetty No.07 | Block Estimate prepared and submitted for Design check. |