Close

Design, supply, Installation, Testing & commissioning of 20 MW ±10% Hybrid Power Plant on LSTK basis & CAMC for the period 23 Year (after completion free guarantee period of 2 years)

  1. Home
  2. /
  3. Design, supply, Installation, Testing...

Design, supply, Installation, Testing & commissioning of 20 MW ±10% Hybrid Power Plant on LSTK basis & CAMC for the period 23 Year (after completion free guarantee period of 2 years)

Bookmark the permalink.

Color