EOI for ” Dredging in Approach Channel, Turning Circle, Berth Pockets surrounding of Landing Pontoon, etc., for maintaining 6.8m BCD from the existing dredged level at Ghogha Ro-Ro Terminal – Gujarat”.
EOI for ” Dredging in Approach Channel, Turning Circle, Berth Pockets surrounding of Landing Pontoon, etc., for maintaining 6.8m BCD from the existing dredged level at Ghogha Ro-Ro Terminal – Gujarat”.