{"id":622,"date":"2021-09-07T07:55:41","date_gmt":"2021-09-07T07:55:41","guid":{"rendered":"http:\/\/localhost\/deendayalporttrust\/?page_id=622"},"modified":"2026-04-15T18:02:14","modified_gmt":"2026-04-15T12:32:14","slug":"green-port-initiatives","status":"publish","type":"page","link":"https:\/\/www.deendayalport.gov.in\/en\/projects\/green-port-initiatives\/","title":{"rendered":"Green Port Initiatives"},"content":{"rendered":"<p><\/p>\n<h2 style=\"font-family: Arial, sans-serif; font-size: 28px; font-weight: bold; color: #0a5c36; text-align: center; margin-bottom: 20px; padding-bottom: 10px; border-bottom: 3px solid #0A5C36;\">GREEN PORT INITIATIVES OF MECHANICAL ENGINEERING DEPARTMENT<\/h2>\n<div style=\"max-width: 850px; margin: 0 auto; background: #F5F9F6; padding: 25px 30px; border-radius: 10px; border: 1px solid #DDE7E2; box-shadow: 0 4px 10px rgba(0,0,0,0.08);\">\n<div style=\"display: flex; align-items: flex-start;\"><span style=\"font-size: 18px; color: #0a5c36; margin-right: 10px; font-weight: bold;\"><br \/>\n\u00bb<br \/>\n<\/span><br \/>\n<span style=\"font-size: 17px; line-height: 1.5; color: #333; font-family: Arial, sans-serif;\"><br \/>\nWork order awarded in July 2025 for first GTTP Compliant GREEN TUG.<br \/>\n<\/span><\/div>\n<div style=\"display: flex; align-items: flex-start;\"><span style=\"font-size: 18px; color: #0a5c36; margin-right: 10px; font-weight: bold;\"><br \/>\n\u00bb<br \/>\n<\/span><br \/>\n<span style=\"font-size: 17px; line-height: 1.5; color: #333; font-family: Arial, sans-serif;\"><br \/>\nInstalled <strong>1MW<\/strong> Green Hydrogen demonstration plant at Kandla On July 31, 2025.<br \/>\n<\/span><\/div>\n<div style=\"display: flex; align-items: flex-start;\"><span style=\"font-size: 18px; color: #0a5c36; margin-right: 10px; font-weight: bold;\"><br \/>\n\u00bb<br \/>\n<\/span><br \/>\n<span style=\"font-size: 17px; line-height: 1.5; color: #333; font-family: Arial, sans-serif;\"><br \/>\nWork order Awarded for <strong>5 MW<\/strong> Green Hydrogen Plant in DPA with capabilities to further enhance up to 10 MW, marking India&#8217;s first port-based green hydrogen project.<br \/>\n<\/span><\/div>\n<div style=\"display: flex; align-items: flex-start;\"><span style=\"font-size: 18px; color: #0a5c36; margin-right: 10px; font-weight: bold;\"><br \/>\n\u00bb<br \/>\n<\/span><br \/>\n<span style=\"font-size: 17px; line-height: 1.5; color: #333; font-family: Arial, sans-serif;\"><br \/>\nWork order awarded for DSITC of <strong>5 TPD<\/strong> Bio-Methanol plant.<br \/>\n<\/span><\/div>\n<div style=\"display: flex; align-items: flex-start;\"><span style=\"font-size: 18px; color: #0a5c36; margin-right: 10px; font-weight: bold;\"><br \/>\n\u00bb<br \/>\n<\/span><br \/>\n<span style=\"font-size: 17px; line-height: 1.5; color: #333; font-family: Arial, sans-serif;\"><br \/>\nUnder Green Initiatives (Green Mobility) an MoU has been signed with NTPC for the deployment of 11 hydrogen buses.<br \/>\n<\/span><\/div>\n<\/div>\n<div>\u00a0<\/div>\n<div>\n<table class=\" aligncenter\" style=\"width: 123.211%; border-style: solid; background-color: #f7f7f7;\" width=\"98.8192%\" data-start=\"57\" data-end=\"3128\">\n<tbody>\n<tr style=\"background-color: #2323ad;\" data-start=\"57\" data-end=\"312\">\n<td style=\"width: 13.5937%;\" width=\"48\"><span style=\"color: #ffffff;\"><strong>Sr. No.<\/strong><\/span><\/td>\n<td style=\"width: 51.4062%;\" width=\"457\"><span style=\"color: #ffffff;\"><strong>Name of Works<\/strong><\/span><\/td>\n<td style=\"width: 63.0425%;\" width=\"177\"><span style=\"color: #ffffff;\"><strong>Dates (Award\/Completion)<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 128.042%;\" colspan=\"3\" data-col-size=\"sm\" data-start=\"575\" data-end=\"614\"><strong>GREEN TUG TRANSITION PROGRAMME<\/strong><\/td>\n<\/tr>\n<tr data-start=\"819\" data-end=\"1097\">\n<td style=\"width: 13.5937%;\" data-start=\"819\" data-end=\"828\" data-col-size=\"sm\">1<\/td>\n<td style=\"width: 51.4062%;\" width=\"457\" data-col-size=\"xl\" data-start=\"867\" data-end=\"1044\">Chartering of Manning, Operation, Maintenance and complete technical management of contractor owned 01 nos. ASTDS-GTTP tug for 15 years and extendable by 02 more years at DPA<\/td>\n<td style=\"width: 63.0425%;\" data-col-size=\"sm\" data-start=\"1044\" data-end=\"1097\">Jul-25<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 128.042%;\" colspan=\"3\" data-start=\"1107\" data-end=\"1146\" data-col-size=\"sm\"><strong>RENEWABLE ENERGY POWER PROJECT<\/strong><\/td>\n<\/tr>\n<tr data-start=\"1351\" data-end=\"1602\">\n<td style=\"width: 13.5937%;\" data-start=\"1351\" data-end=\"1360\" data-col-size=\"sm\">1<\/td>\n<td style=\"width: 51.4062%;\" width=\"457\" data-col-size=\"xl\" data-start=\"1399\" data-end=\"1548\">Implementation of 20.7 MW Wind Power to promote renewable energy usage, with plans to further expand capacity by 40 MW<\/td>\n<td style=\"width: 63.0425%;\" width=\"177\" data-col-size=\"sm\" data-start=\"1548\" data-end=\"1602\">March 2017 (6 MW), March 2019 (14.7 MW)<\/td>\n<\/tr>\n<tr data-start=\"1603\" data-end=\"1856\">\n<td style=\"width: 13.5937%;\" data-start=\"1603\" data-end=\"1612\" data-col-size=\"sm\">2<\/td>\n<td style=\"width: 51.4062%;\" data-col-size=\"xl\" data-start=\"1651\" data-end=\"1803\">251 KW Solar Rooftop Power Plant under CSR<\/td>\n<td style=\"width: 63.0425%;\" data-col-size=\"sm\" data-start=\"1803\" data-end=\"1856\">Jan-26<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 128.042%;\" colspan=\"3\" data-col-size=\"sm\" data-start=\"1866\" data-end=\"1907\"><strong>ELECTRIFICATION OF PORT EQUIPMENTS<\/strong><\/td>\n<\/tr>\n<tr data-start=\"2112\" data-end=\"2366\">\n<td style=\"width: 13.5937%;\" data-start=\"2112\" data-end=\"2121\" data-col-size=\"sm\">1<\/td>\n<td style=\"width: 51.4062%;\" data-col-size=\"xl\" data-start=\"2160\" data-end=\"2312\">Deployment of 13 Nos. Electric Pay Loader for Cargo operation<\/td>\n<td style=\"width: 63.0425%;\" width=\"177\" data-col-size=\"sm\" data-start=\"2312\" data-end=\"2366\">Feb 2025 (8 Nos), Jan 2026 (5 Nos)<\/td>\n<\/tr>\n<tr data-start=\"2367\" data-end=\"2620\">\n<td style=\"width: 13.5937%;\" data-start=\"2367\" data-end=\"2376\" data-col-size=\"sm\">2<\/td>\n<td style=\"width: 51.4062%;\" width=\"457\" data-col-size=\"xl\" data-start=\"2415\" data-end=\"2567\">Electrification of 18 Nos. of Equipment handling Containers in Berth nos. 11 &amp; 12<\/td>\n<td style=\"width: 63.0425%;\" data-col-size=\"sm\" data-start=\"2567\" data-end=\"2620\">Nov-25<\/td>\n<\/tr>\n<tr data-start=\"2621\" data-end=\"2874\">\n<td style=\"width: 13.5937%;\" data-start=\"2621\" data-end=\"2630\" data-col-size=\"sm\">3<\/td>\n<td style=\"width: 51.4062%;\" data-col-size=\"xl\" data-start=\"2669\" data-end=\"2821\">Electrification of HMCs<\/td>\n<td style=\"width: 63.0425%;\" data-col-size=\"sm\" data-start=\"2821\" data-end=\"2874\">Nov-25<\/td>\n<\/tr>\n<tr data-start=\"2875\" data-end=\"3128\">\n<td style=\"width: 13.5937%;\" data-start=\"2875\" data-end=\"2884\" data-col-size=\"sm\">4<\/td>\n<td style=\"width: 51.4062%;\" data-col-size=\"xl\" data-start=\"2923\" data-end=\"3075\">Demonstration of LIM based Mobility Project<\/td>\n<td style=\"width: 63.0425%;\" data-col-size=\"sm\" data-start=\"3075\" data-end=\"3128\">Mar-26<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<\/div>\n<table class=\" aligncenter\" style=\"width: 98.2788%;\" width=\"72.8125%\">\n<tbody>\n<tr style=\"background-color: #2323ad;\">\n<td style=\"width: 13.4375%;\" width=\"48\"><span style=\"color: #ffffff;\"><strong>Sr. No.<\/strong><\/span><\/td>\n<td style=\"width: 51.5625%;\" width=\"480\"><span style=\"color: #ffffff;\"><strong>Name of Works<\/strong><\/span><\/td>\n<td style=\"width: 39.9541%;\" width=\"177\"><span style=\"color: #ffffff;\"><strong>Dates (Award\/Completion)<\/strong><\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 104.954%;\" colspan=\"3\" width=\"705\"><strong>SHORE TO SHIP POWER SUPPLY<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 13.4375%;\" width=\"48\" data-start=\"786\" data-end=\"795\" data-col-size=\"sm\">1<\/td>\n<td style=\"width: 51.5625%;\" width=\"480\" data-col-size=\"lg\" data-start=\"830\" data-end=\"997\">Provided Electric Power Supply to Crafts &amp; Tugs<\/td>\n<td style=\"width: 39.9541%;\" width=\"177\" data-col-size=\"sm\" data-start=\"997\" data-end=\"1025\">Jan-25<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 104.954%;\" colspan=\"3\" width=\"705\"><strong>GREEN MOLECULES<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 13.4375%;\" width=\"48\" data-start=\"1266\" data-end=\"1275\" data-col-size=\"sm\">1<\/td>\n<td style=\"width: 51.5625%;\" data-col-size=\"lg\" data-start=\"1310\" data-end=\"1477\">Engaged M\/s DNV India for gap assessment on Port Readiness for Green Methanol Bunkering<\/td>\n<td style=\"width: 39.9541%;\" width=\"177\" data-col-size=\"sm\" data-start=\"1477\" data-end=\"1505\">Jan-25<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 13.4375%;\" width=\"48\" data-start=\"1506\" data-end=\"1515\" data-col-size=\"sm\">2<\/td>\n<td style=\"width: 51.5625%;\" width=\"480\" data-col-size=\"lg\" data-start=\"1550\" data-end=\"1715\">Commissioning of 1 MW Green Hydrogen Demonstration Plant (India\u2019s First Make-in-India Mega-Watt Scale GH2 Plant in Port Sector)<\/td>\n<td style=\"width: 39.9541%;\" width=\"177\" data-col-size=\"sm\" data-start=\"1715\" data-end=\"1743\">July 31, 2025<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 13.4375%;\" width=\"48\" data-start=\"1744\" data-end=\"1753\" data-col-size=\"sm\">3<\/td>\n<td style=\"width: 51.5625%;\" width=\"480\" data-col-size=\"lg\" data-start=\"1788\" data-end=\"1954\">Award of 5 MW Green Hydrogen Plant with capabilities to further enhance up to 10 MW, marking India\u2019s first port-based green hydrogen project<\/td>\n<td style=\"width: 39.9541%;\" width=\"177\" data-col-size=\"sm\" data-start=\"1954\" data-end=\"1982\">Jan-26<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 13.4375%;\" width=\"48\" data-start=\"1983\" data-end=\"1992\" data-col-size=\"sm\">4<\/td>\n<td style=\"width: 51.5625%;\" width=\"480\" data-col-size=\"lg\" data-start=\"2027\" data-end=\"2194\">Award of 5 TPD Bio-Methanol Plant<\/td>\n<td style=\"width: 39.9541%;\" width=\"177\" data-col-size=\"sm\" data-start=\"2194\" data-end=\"2222\">Jan-26<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 13.4375%;\" width=\"48\" data-start=\"2223\" data-end=\"2232\" data-col-size=\"sm\">5<\/td>\n<td style=\"width: 51.5625%;\" width=\"480\" data-col-size=\"lg\" data-start=\"2267\" data-end=\"2433\">Award of Green Mobility Project (GH2 Bus) to NTPC for deployment of 11 Nos. FCEV Buses<\/td>\n<td style=\"width: 39.9541%;\" width=\"177\" data-col-size=\"sm\" data-start=\"2433\" data-end=\"2461\">Feb-26<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 104.954%;\" colspan=\"3\" width=\"705\"><strong>ENERGY EFFICIENT MEASURES<\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 13.4375%;\" width=\"48\" data-start=\"2702\" data-end=\"2711\" data-col-size=\"sm\">1<\/td>\n<td style=\"width: 51.5625%;\" width=\"480\" data-col-size=\"lg\" data-start=\"2746\" data-end=\"2915\">100% energy efficient LED light<\/td>\n<td style=\"width: 39.9541%;\" width=\"177\" data-col-size=\"sm\" data-start=\"2915\" data-end=\"2943\">Jun-21<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 13.4375%;\" width=\"48\" data-start=\"2944\" data-end=\"2953\" data-col-size=\"sm\">2<\/td>\n<td style=\"width: 51.5625%;\" width=\"480\" data-col-size=\"lg\" data-start=\"2988\" data-end=\"3156\">Replacement of 7000 conventional fans with 5 star rating BLDC<\/td>\n<td style=\"width: 39.9541%;\" width=\"177\" data-col-size=\"sm\" data-start=\"3156\" data-end=\"3184\">Feb-26<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>GREEN PORT INITIATIVES OF MECHANICAL ENGINEERING DEPARTMENT \u00bb Work order awarded in July 2025 for first GTTP Compliant GREEN TUG. \u00bb Installed 1MW Green Hydrogen demonstration plant at Kandla On July 31, 2025. \u00bb Work order Awarded for 5 MW Green Hydrogen Plant in DPA with capabilities to further enhance up to 10 MW, marking India&#8217;s first port-based green hydrogen project. \u00bb Work order awarded for DSITC of 5 TPD Bio-Methanol plant. \u00bb Under Green &hellip; <a href=\"https:\/\/www.deendayalport.gov.in\/en\/projects\/green-port-initiatives\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":601,"menu_order":158,"comment_status":"closed","ping_status":"closed","template":"","meta":{"episode_type":"","audio_file":"","cover_image":"","cover_image_id":"","duration":"","filesize":"","date_recorded":"","explicit":"","block":"","filesize_raw":""},"_links":{"self":[{"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages\/622"}],"collection":[{"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/comments?post=622"}],"version-history":[{"count":28,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages\/622\/revisions"}],"predecessor-version":[{"id":41107,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages\/622\/revisions\/41107"}],"up":[{"embeddable":true,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages\/601"}],"wp:attachment":[{"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/media?parent=622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}