{"id":37354,"date":"2025-06-06T18:06:34","date_gmt":"2025-06-06T12:36:34","guid":{"rendered":"https:\/\/www.deendayalport.gov.in\/?page_id=37354"},"modified":"2026-03-10T18:05:24","modified_gmt":"2026-03-10T12:35:24","slug":"port-environment-1","status":"publish","type":"page","link":"https:\/\/www.deendayalport.gov.in\/en\/downloads\/port-environment-1\/","title":{"rendered":"Port Environment"},"content":{"rendered":"<p><\/p>\n<h1>Port Environment<\/h1>\n<table class=\"table-fill table-responsive table-striped\" style=\"width: 134.219%;\">\n<thead>\n<tr style=\"height: 36px;\">\n<th class=\"col-md-1\" style=\"height: 36px; width: 12.5%;\">Sr. No.\u00a0<\/th>\n<th class=\"col-md-1\" style=\"height: 36px; width: 21.5625%;\">Date of issue<\/th>\n<th style=\"height: 36px; width: 133.648%;\">Subject<\/th>\n<\/tr>\n<tr style=\"height: 36px;\">\n<th style=\"height: 36px; width: 12.5%;\">Year- 2026<\/th>\n<th style=\"height: 36px; width: 21.5625%;\">\u00a0<\/th>\n<th style=\"height: 36px; width: 133.648%;\">\u00a0<\/th>\n<\/tr>\n<tr style=\"height: 64px;\">\n<td style=\"width: 12.5%; height: 64px;\">1<\/td>\n<td style=\"width: 21.5625%; height: 64px;\">\n<p>08\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 64px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/EG-WK-5202-D-Part-139-30.12.2025-EC-Compliance.pdf\">Environment &amp; CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority &#8211; Environmental &amp; CRZ Clearance &#8211; Submission of Six Monthly Compliance of conditions stipulated in EC CRZ Clearance<\/a><\/td>\n<\/tr>\n<tr style=\"height: 64px;\">\n<td style=\"width: 12.5%; height: 64px;\">2<\/td>\n<td style=\"width: 21.5625%; height: 64px;\">\n<p>08\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 64px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/EG-WK-5202-D-Part-138-30.12.2025-CRZ-Compliance.pdf\">CRZ Clearance for proposed construction of Interchange cum Road Over Bridge at N.H.141 to Nehru Gate of Deendayal Port Trust, Kandla, Dist: Kutch by Deendayal Port Authority (Erstwhile: Deendayal Port Trust) &#8211; Submission of Six monthly compliance report of CRZ Recommendation &#8211; reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">3<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">\n<p>09\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/Creation-of-water-front-facilities-Oil-Jetties-8-9-10-11-EC-CRZ-dated-09.01.2026..pdf\">Submission of six-monthly compliance report of conditions stipulated in EC &amp; CRZ Clearance granted by the MoEF&amp;CC, GoI for \u201cCreation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust)\u201d reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">4<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">\n<p>09\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/Creation-of-water-front-facilities-Oil-Jetties-8-9-10-11-NOC-CTE-dated-09.01.2026.pdf\">Submission of six monthly compliance report of conditions stipulated in NOC\/CTE issued by the GPCB, GoG for \u201cCreation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust)\u201dreg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 64px;\">\n<td style=\"width: 12.5%; height: 64px;\">5<\/td>\n<td style=\"width: 21.5625%; height: 64px;\">\n<p>09\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 64px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/Creation-of-water-front-facilities-Oil-Jetties-8-9-10-11-CRZ-Recommendation-dated-09.01.2026.pdf\">Submission of Six-monthly compliance report of conditions stipulated in CRZ Clearance granted by GCZMA, Gujarat for \u201cCreation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust)\u201dreg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">6<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>12\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/EG-WK-4751-Part-Comp.111_CRZ-compliance-7-inte.-_December-2025_.pdf\">Submission of six-monthly compliance report of conditions stipulated in CRZ Recommendation granted by the GCZMA, GoG for \u201cDevelopment of 7 integrated facilities (Stage I) within existing Deendayal Authority at Kandla<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">7<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>12\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/EG-WK-4751-Part-Comp.1-10_EC-compliance-7-inte._Dec-2025.pdf\">Submission of six-monthly compliance report of conditions stipulated in EC&amp;CRZ Clearance accorded by the MoEF&amp;CC, GoI and Monitoring data sheet for \u201cDevelopment of 7 integrated facilities (Stage I) within existing Deendayal Authority at Kandla<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">8<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>12\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/compliance_Dec-2025.zip\">Submission of six-monthly compliance report of conditions stipulated in NOC\/CTE Order issued by the GPCB, GoG for \u201cDevelopment of 7 integrated facilities (Stage I) within existing Deendayal Authority at Kandla<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">9<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>23\/01\/2026<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/01\/OJ-7-CCA-Compliance-March-2025-dt-23.01.2026.pdf\">Consolidated Consent &amp; Authorization order no AWH-123831 date of issue 20\/01\/2023 (GPCB ID 48573 &#8220;Oil Jetty no. 7&#8221;)- Submission of compliance report of stipulated conditions mentioned in the CCA Order issued by the GPCB reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">10<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">27\/02\/2026<\/td>\n<td style=\"height: 48px; width: 133.648%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/02\/EG-WK-4751-Part-3-remaining-34_EC-CRZ-Compliance-Dec-2025.pdf\">Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat &#8211; Pointwise Compliance of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">11<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">27\/02\/2026<\/td>\n<td style=\"height: 48px; width: 133.648%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/02\/EG-WK-4751-3-remaining-36_CTE-compliance-Dec-2025_.pdf\">Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat. Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB reg.<\/a><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 12.5%;\">12<\/td>\n<td style=\"width: 21.5625%;\">27\/02\/2026<\/td>\n<td style=\"width: 133.648%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2026\/02\/EG-WK-4751-Part-3-remaining-35_CRZ-clearance-Dec-2025.pdf\">Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat. Submission of Point-wise Compliances of the stipulated conditions in CRZ Recommendations reg<\/a><\/td>\n<\/tr>\n<\/thead>\n<\/table>\n<table class=\"table-fill table-responsive table-striped\" style=\"width: 134.217%; height: 31870px;\">\n<thead>\n<tr style=\"height: 36px;\">\n<th class=\"col-md-1\" style=\"height: 36px; width: 12.5%;\">Sr. No.\u00a0<\/th>\n<th class=\"col-md-1\" style=\"height: 36px; width: 21.5625%;\">Date of issue<\/th>\n<th style=\"height: 36px; width: 99.4297%;\">Subject<\/th>\n<\/tr>\n<tr style=\"height: 36px;\">\n<th style=\"height: 36px; width: 12.5%;\">Year- 2025<\/th>\n<th style=\"height: 36px; width: 21.5625%;\">\u00a0<\/th>\n<th style=\"height: 36px; width: 99.4297%;\">\u00a0<\/th>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">1<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">18\/01\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/01\/EG-WK-4660-EC-Part-V_05.pdf\">Construction of 13th to 16h Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance and Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">2<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">18\/01\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/01\/EG-WK-4660-EC-Part-V_06.pdf\">&#8220;Construction of 13th to 16th Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Point wise Compliance to the stipulations in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">3<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">21\/01\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/01\/EG-WK-4751-Part-NOC-Complaince-dev-of-int.-7-21.01.2025-2.pdf\">Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Pointwise Compliance of the conditions stipulated in NOC (CTE-74334) issued by GPCB reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">4<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">22\/01\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/01\/EG-WK-4751-part-point-wise-complaince-CRZ-Rec-dev.-int-facilities-21.01.2025-2.pdf\">Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Pointwise Compliances of the conditions stipulated in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">5<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">22\/01\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/01\/EG-WK-4751-part-Point-wise-complaince-EC-and-CRZ-Clearance-dev-of-7-int-facilities-21.01.2025-2.pdf\">Development of 7 Integrated facilities (Stage I) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Pointwise Compliances of the conditions stipulated in EC &amp; CRZ Clearance and Monitoring Report in Datasheet Reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">6<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">03\/02\/2025<\/td>\n<td style=\"width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-4684-EC-part-VII-OJ-8-to-11-NOC-Complaince-03.02.2025.pdf\">Creation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust)- Submission of Point-wise Compliance of Conditions stipulated in the NOC\/CTE reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">7<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">03\/02\/2025<\/td>\n<td style=\"width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-5202-Creation-of-water-front-facilities-OJ-8-to-11-and-development-of-land-554-ha-CRZ-complince-03.02.25.pdf\">CRZ Clearance for \u201cCreation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority\u201d &#8211; Submission of six-monthly Compliance of the stipulated conditions in CRZ recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">8<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">03\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 144px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-5202-Creation-of-water-front-facility-OJ-8-to-11-and-development-of-554-ha-EC-and-CRZ-complince-03.02.2025.pdf\">Creation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority\u201d \u2013 Environmental &amp; CRZ Clearance &#8211; Submission of six-monthly Compliance of the stipulated conditions in EC &amp; CRZ Clearance and Monitoring Report in Data sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">9<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">05\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-4751-EC-onwards-Augementation-of-liquid-cargo-handling-cap.-from-8-mmtpa-to-23.8-mmtpa-NOC-complince-03.02.2025.pdf\">Submission of six-monthly compliance report of conditions stipulated in NOC\/CTE Order issued by the GPCB, GoG for &#8220;Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernization of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla&#8221;<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">10<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">05\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-4751-part-revamping-EC-onwards-Aug.-of-liquid-cargo-handling-capacity-from-8-mmtpa-to-23.8-mmtpa-EC-and-CRZ-compl.-03.02.2025.pdf\">Submission of six-monthly compliance report of conditions stipulated in EC&amp;CRZ Clearance accorded by the MoEF&amp;CC, GoI and Monitoring data sheet for &#8220;Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernization of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla&#8221;<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">11<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">05\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-4751-Revamping-and-EC-onwards-Aug.-of-liquid-cargo-handling-capacity-from-8-mmtpa-to-23.8-mmtpa-CRZ-complince-03.02.2025.pdf\">Submission of six-monthly compliance report of conditions stipulated in CRZ Recommendation granted by the GCZMA, GoG for &#8221; Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernization of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">12<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">11\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 144px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/CN-WK-1600-A-EC-CRZ-Clearance-onwards-Muldwarka-26.pdf\">Development of Setting up of RoRo\/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74\/3 for OnShore area- 6 Ha, Muldwarks, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront &amp; Onshore Facility: 6Ha. Area Development) &#8211; Pointwise Compliances of the conditions stipulated in the CRZ recommendation reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">13<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">11\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 144px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/CN-WK-1600-A-EC-CRZ-Clearance-onwards-Muldwarka-25.pdf\">Development of Setting up of RoRo\/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74\/3 for OnShore area- 6 Ha, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront &amp; Onshore Facility: 6Ha. Area Development) &#8211; Pointwise Compliances of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">14<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">13\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 96px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-4712-Part-II-29.pdf\">Setting up of Single Point Mooring (SPM) and Allied Facilities off-Veera in Gulf of Kutch for handling Crude oil on BOT basis &#8211; Six Monthly Compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance &amp; Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">15<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">13\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-5202D-Part-CRZ-2-28.pdf\">Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M\/s. Kandla Port Trust (Now Deendayal Port Authority)- Six monthly compliance report of conditions stipulated in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">16<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">19\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 96px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/CN-WK-1600-A-EC-CRZ-Clearance-onwards-Pipavav-31_19.02.2025-EC-CRZ-compliance-report.pdf\">Development of Setting up of RoRo\/RoPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority &#8211; Pointwise Compliances of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"width: 12.5%; height: 72px;\">17<\/td>\n<td style=\"width: 21.5625%; height: 72px;\">19\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 72px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/CN-WK-1600-A-EC-CRZ-Clearance-onwards-Pipavav-32_19.02.2025-CRZ-rec.-compliance-report.pdf\">Development of Setting up of RoRo\/ROPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority &#8211; Pointwise Compliances of the conditions stipulated in the CRZ recommendation reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"width: 12.5%; height: 192px;\">18<\/td>\n<td style=\"width: 21.5625%; height: 192px;\">24\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 192px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-4751-Part-Stage-II-CRZ-Complaince-24.02.2024.pdf\">&#8220;Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty no. 7, 2. Setting up of Barge Jetty at Jafrabadi, 3. Setting up of Barge Port at Veera, 4. Administrative office building at Tuna Tekra, 5. Road connecting from Veera Barge Jetty to Tuna gate by Deendayal Port Authority (Erstwhile Deendayal Port Trust)&#8221;- Pointwise Compliances of the conditions stipulated in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"width: 12.5%; height: 192px;\">19<\/td>\n<td style=\"width: 21.5625%; height: 192px;\">24\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 192px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-4751-Part-II-Stage-II-EC-and-CRZ-complaince-24.02.2025.pdf\">&#8220;Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty no. 7, 2. Setting up of Barge Jetty at Jafrabadi, 3. Setting up of Barge Port at Veera, 4. Administrative office building at Tuna Tekra, 5. Road connecting from Veera Barge Jetty to Tuna gate by Deendayal Port Authority (Erstwhile Deendayal Port Trust)- Six monthly compliance report of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"width: 12.5%; height: 192px;\">20<\/td>\n<td style=\"width: 21.5625%; height: 192px;\">24\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 192px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-4751-part-stage-II-NOC-complaince-24.02.2025-1.pdf\">&#8220;Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty no. 7, 2. Setting up of Barge Jetty at Jafrabadi, 3. Setting up of Barge Port at Veera, 4. Administrative office building at Tuna Tekra, 5. Road connecting from Veera Barge Jetty to Tuna gate by Deendayal Port Authority (Erstwhile Deendayal Port Trust)&#8221; &#8211; Pointwise Compliance of the conditions stipulated in NOC issued by GPCB reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">21<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">26\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 96px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-5203-D-VIII-EC-Compliance-37-Dated-26.02.2025_EC-compliance-report.pdf\">Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch Gujarat by M\/s Deendayal Port Authority Compliance report for the project reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"width: 12.5%; height: 48px;\">22<\/td>\n<td style=\"width: 21.5625%; height: 48px;\">26\/02\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 48px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/02\/EG-WK-5203-D-VIII-EC-Compliance-38-Dated-26.022025_CTE-Compliance-report.pdf\"> &#8220;Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch, Gujarat-3 70 201&#8221; by M\/s Deendayal Port Authority- Submission of Six monthly Compliance report for the project reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"width: 12.5%; height: 48px;\">23<\/td>\n<td style=\"width: 21.5625%; height: 48px;\">20\/03\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 48px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/downloads\/port-environment\/eg-wk-5203-d-viii-ec-compliance-48\/\" rel=\"attachment wp-att-36627\">Proposed Smart Industrial Port City (SIPC) at Green Field Site 2 (KPT complex, 850 Acres), Gandhidham,Kutch &#8211; Gujarat by M\/s Kandla Port Trust &#8211; Six Monthly Compliance Report of conditions stipulated in NOC\/CTE order reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">24<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">20\/03\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-5203-D-VIII-EC-Compliance-47.pdf\">Proposed Smart Industrial Port City (SIPC) at green Field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch Gujarat by M\/s Deendayal Port Authority (Erstwhile: M\/s Kandla Port Trust) Six Monthly compliance Report of conditions stipulated in Environmental Clearance &amp; Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">25<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">24\/03\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-5203-D-VIII-EC-Compliance-47-1.pdf\"> Environment &amp; CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M\/s Deendayal Port Trust &#8211; Compliance of stipulated Conditions mentioned in the Environmental &amp; CRZ Clearance reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">26<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">24\/03\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-5202-D-Part-54.pdf\"> CRZ Clearence for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) Compliance of stipulated conditions mentioned in the CRZ recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">27<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">02\/04\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 120px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-Part-3-remaining-facilities-II-58.pdf\">Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat Pointwise Compliance of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">28<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">02\/04\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 96px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-Part-3-remaining-facilities-II-57.pdf\">Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat Submission of Point-wise Compliances of the stipulated conditions in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">29<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">02\/04\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 96px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-Part-3-remaining-facilities-II-56-1.pdf\">Development of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">30<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">04\/04\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 96px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/Brief-of-work-assigned-to-CSIR-CSCMCRI-setting-up-of-int-ship-building-cluster-at-DPA-04.04.2025-2.pdf\">Details of Work Assigned to CSIR &#8211; Central Salt and Marine Chemicals Research Institute (CSMCRI), Bhavnagar for Obtaining Environmental &amp; CRZ Clearance for the proposal \u201cDevelopment of Setting up of Integrated ship building cluster at Deendayal Port Authority, Kandla\u201d<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">31<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">08\/05\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-Part-Ro-Pax-64-EC-compliance-report.pdf\">Division of Environmental &amp; CRZ Clearance to M\/s Essar Bulk Terminal Ltd. for expansion of port facility at Hazira, Surat, Gujarat (600m waterfront out of total 4800m) &#8211; Regarding submission of compliance report of prescribed conditions<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">32<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">08\/05\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-Part-Ro-Pax-65-CRZ-compliance-report.pdf\">Grant of Environmental &amp; CRZ Clearance to M\/s Essar Bulk Terminal Ltd. for expansion of port facility at Hazira, Surat, Gujarat (600m waterfront out of total 4800m) &#8211; Submission of compliance report of the conditions prescribed in respect of CRZ recommendation.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"width: 12.5%; height: 48px;\">33<\/td>\n<td style=\"width: 21.5625%; height: 48px;\">09\/05\/2025<\/td>\n<td style=\"text-align: left; width: 99.4297%; height: 48px;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/05\/EG-WK-4751-Part-Ro-Pax-65-CRZ-compliance-report.pdf\">Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M\/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat &#8211; Submission of Compliance Report of Stipulated Conditions in CRZ recommendation reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">34<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">02\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-Part-comp-Dev-of-7-in-facilities-NOC-Complaince-02.06.2025.pdf\">Development of 7 Integrated Facilities (Phase I) within the existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Limited\u201d \u2013 Point wise compliance of conditions stipulated in the NOC (CTE- 74334) issued by GPCB.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">35<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">02\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-EC-and-CRZ-Complaince-deve-of-7-int-facilities-02.06.2025.pdf\">Development of 7 Integrated Facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Ltd\u201d. Point wise compliance of the conditions stipulated in the EC &amp; CRZ Clearance and Monitoring Report in respect of Environmental and CRZ Clearance Datasheet.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">36<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">02\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-EC-onwards-Augementation-of-liquid-cargo-handling-cap.-from-8-mmtpa-to-23.8-mmtpa-NOC-complince-02.06.2025.pdf\">Expansion of liquid cargo handling capacity from 8 MMTPA to 23.8 micron through modernization of existing pipeline network at Oil Jetty Area, Deendayal Port Trust, Kandla &#8211; Point wise compliance of conditions stipulated in the NOC (CTE &#8211; 115467) issued by GPCB Reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">37<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">02\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-Part-CRZ-Complaince-Dec-June-2025.pdf\">Expansion of liquid cargo handling capacity from 8 MMTPA to 23.8 MMTPA through modernization of existing pipeline network at Oil Jetty Area, Deendayal Port Trust, Kandla. Point wise compliance of conditions laid down in CRZ recommendation.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">38<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">02\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/Augmentation-of-liquid-cargo-handling-capacity-from-8-MMTPA-to-23.8-MMTPA-EC-and-CRZ-Complaince-02.06.2025-1-2.pdf\">Expansion of liquid cargo handling capacity from 8 MMTPA to 23.8 micron through modernization of existing pipeline network at Oil Jetty Area, Deendayal Port Trust, Kandla &#8211; Point wise compliance of conditions stipulated in EC &amp; CRZ clearance and monitoring report in datasheet required.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">39<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">02\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-4751-part-comp-complaince-to-GCZMA-recommendation-Dev-of-7-int-facilities-02.06.2025-1.pdf\">Development of 7 Integrated Facilities (Phase I) within the existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Limited\u201d \u2013 Point wise compliance of the conditions laid down in the CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">40<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">10\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-5203-VIII-EC-Compliance-17.pdf\">Proposed Smart Industrial Port City (SIPC) at Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch Gujarat by M\/s Deendayal Port Authority (Erstwhile: M\/s Kandla Port Trust) &#8211; Six monthly compliance report of conditions stipulated in Environmental Clearance &amp; Monitoring report in Data sheet reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">41<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">10\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-5203-VIII-EC-Compliance-18-1.pdf\">Proposed Smart Industrial Port City (SIPC) at Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch Gujarat by M\/s Deendayal Port Authority (Erstwhile: M\/s Kandla Port Trust) &#8211; Six monthly compliance report of conditions stipulated in NOC\/CTE order reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">42<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">10\/06\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/Offer-for-the-work-of-Continuous-improvement-of-ISO-14001-2015-1.pdf\">Request to submit offer for &#8220;Continual improvement of ISO 14001:2015 Environment Management System of Deendayal Port Authority for the period of two years<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">43<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">18\/06\/2025<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-EC-Part-VII-NOC-Complaince-OJ-8-to-11-18.06.2025.pdf\">Creation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust)- Submission of Point-wise Compliance of Conditions stipulated in the NOC\/CTE reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">44<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">18\/06\/2025<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-5202-D-Part-CRZ-OJ-8-to-11-CRZ-Complaince-18.06.2025.pdf\">CRZ Clearance for &#8220;Creation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority&#8221; &#8211; Submission of six-monthly Compliances Recommendations req. of the stipulated conditions in CRZ<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">45<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">18\/06\/2025<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/06\/EG-WK-5202-D-Part-EC-Complaince-OJ-8-to-11-18.06.2025.pdf\">Creation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Trust Environmental &amp; CRZ Clearance &#8211; Submission of Six Monthly Compliance report for the stipulated conditions in EC&amp;CRZ Clearance and Monitoring Report in Data sheet reg,<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">46<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">09\/07\/2025<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/CN-WK-1600-A-ECCRZ-Clearance-onwards-Muldwarka-34.pdf\">Development of Setting up of RoRo\/RoPax Facility at Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74\/3 for Onshore Area 6 Na, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront &amp; Onshore Facility: 6 Ha. Development Area) Pointwise Compliances of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Data Sheet reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">47<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">09\/07\/2025<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/CN-WK-1600-A-ECCRZ-Clearance-onwards-Muldwarka-35.pdf\">Development of Setting up of RoRo\/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74\/3 for Onshore area -6 Ha, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront &amp; Onshore Facility: 6Ha. Area Development) Pointwise Compliances of the conditions stipulated in the CRZ recommendation reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">48<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">16\/07\/2025<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/EG-WK-4712-Part-II-38_SPM-EC-CRZ-clearance_June-25.pdf\"> Setting up of Single Point Mooring (SPM) and Allied Facilities off Veera in Gulf of Kutch for handling Crude oil on BOT basis &#8211; Six Monthly Compliance Report of conditions stipulated in Environmental &amp; CRZ CIlearance &amp;Monitoring Report in Data Sheet reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">49<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">16\/07\/2025<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/EG-WK-5202-D-Part-CRZ-2-39_SPM-CRZ-rec.June-25.pdf\">Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M\/s. Kandla Port Trust (Now Deendayal Port Authority)- Six monthly compliance report of conditions stipulated in CRZ Recommendations req. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"width: 12.5%; height: 192px;\">50<\/td>\n<td style=\"width: 21.5625%; height: 192px;\">18\/07\/2025<\/td>\n<td style=\"height: 192px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/EG-WK-4751-Part-stage-II-NOC-Complaince-Stage-II-int.-facility-17.07.2025.pdf\">&#8220;Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty no. 7, 2. Setting up of Barge Jetty at Jafrabadi, 3. Setting up of Barge Port at Veera, 4. Administrative office building at Tuna Tekra, 5. Road connecting from Veera Barge Jetty to Tuna gate by Deendayal Port Authority (Erstwhile Deendayal Port Trust)&#8221; Pointwise Compliance of the conditions stipulated in NOC issued by GPCB reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 230px;\">\n<td style=\"width: 12.5%; height: 230px;\">51<\/td>\n<td style=\"width: 21.5625%; height: 230px;\">18\/07\/2025<\/td>\n<td style=\"height: 230px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/EG-WK-4712-Part-II-Stage-2-int-facility-EC-Complaince-17.07.2025.pdf\">&#8220;Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat (1. Setting up of Oil Jetty no. 7, 2. Setting up of Barge Jetty at Jafrabadi, 3. Setting up of Barge Port at Veera, 4. Administrative office building at Tuna Tekra, 5. Road connecting from Veera Barge Jetty to Tuna gate by Deendayal Port Authority (Erstwhile Deendayal Port Trust)- Six monthly compliance report of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">52<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">26\/07\/2025<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/EG-WK-5203-D-VIII-EC-Compliance-48_SIPC-1-EC-compliance_June-2025.pdf\"> Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch Gujarat by M\/s Deendayal Port Authority Compliance report for the project reg. Submission of Six-monthly <\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">53<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">26\/07\/2025<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/EG-WK-5203-D-VIII-EC-Compliance-49_SIPC-I-CTE-compliance-_June-2025.pdf\">&#8220;Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch, Gujarat-370 201&#8221; by M\/s Deendayal Port Authority- Submission of SixX monthly Compliance report for the project reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"width: 12.5%; height: 48px;\">54<\/td>\n<td style=\"width: 21.5625%; height: 48px;\">26\/07\/2025<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/EG-WK-4751-CCA-Renewal-Submission-of-Annual-return-of-Haz-Waste-in-form-IV-for-2024-25-25.07.2025.pdf\">Submission of Environmental statement in format form IV for the financial year 2024-25 reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 64px;\">\n<td style=\"width: 12.5%; height: 64px;\">55<\/td>\n<td style=\"width: 21.5625%; height: 64px;\">\n<p>26\/07\/2025<\/p>\n<\/td>\n<td style=\"height: 64px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/07\/EG-WK-4751-CCA-Renewal-Submission-of-Environmental-Statement-in-form-V-for-2024-25-25.07.2025.pdf\">EG WK 4751 (CCA Renewal) Submission of Environmental Statement in form V for 2024-25 &#8211; 25.07.2025<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">56<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>01\/08\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/08\/EG-WK-5202-D-Part-55_ROB-CRZ-rec.-compliance_June-2025.pdf\"> CRZ Clearence for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) Compliance of stipulated conditions mentioned in the CRZ recommendations reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">57<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>01\/08\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/08\/EG-WK-5202-D-Part-54-dated-30.07.2025_EC-CRZ-compliance-ROB_June-2025.pdf\"> Environment &amp; CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M\/s Deendayal Port Trust &#8211; Compliance of stipulated \u00c7onditions mentioned in the Environmental &amp; CRZ Clearance red. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">58<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>07\/08\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/08\/EG-WK-4660-EC-Part-V-59_13-to-16-Cargoberth-EC-Compliance-report_June-2025-1.pdf\">&#8220;Construction of 13th to 16th Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance and Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">59<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>07\/08\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/08\/CN-WK-1600-AECCRZ-Clearance-onwards-Pipavav-57_0607.08.2025_EC-CRZ-compliance-report_June-2025.pdf\">Development of Setting up of RoRo\/RoPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority &#8211; Pointwise Compliances of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"width: 12.5%; height: 72px;\">60<\/td>\n<td style=\"width: 21.5625%; height: 72px;\">\n<p>07\/08\/2025<\/p>\n<\/td>\n<td style=\"height: 72px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/08\/CN-WK-1600-A-ECCRZ-Clearance-onwards-Pipavav-58_0607.08.2025_Pipavav-CRZ-rec.-Compliance-report-_June-2025.pdf\">Development of Setting up of RoRo\/ROPax Facility at Pipava, Gujarat, Rajula, Amreli by Deendayal Port Authority &#8211; Pointwise Compliances of the conditions stipulated in the CRZ recommendation reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"width: 12.5%; height: 72px;\">61<\/td>\n<td style=\"width: 21.5625%; height: 72px;\">\n<p>07\/08\/2025<\/p>\n<\/td>\n<td style=\"height: 72px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/08\/EG-WK-4660-EC-Part-V-60_13-to-16-Cargoberth-CRZ-rec.-compliance-report_June-2025.pdf\">&#8220;Construction of 13th to 16th Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Point wise Compliance to the stipulations in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"width: 12.5%; height: 72px;\">62<\/td>\n<td style=\"width: 21.5625%; height: 72px;\">\n<p>01\/10\/2025<\/p>\n<\/td>\n<td style=\"height: 72px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/10\/EG-WK-4751-Part-Ro-Pax-71_Bifurcation-of-Hazira-EC-compliance-2.pdf\">Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M\/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">63<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>09\/10\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/10\/EG-WK-4751-Part-3-remaining-facilities-II-75_EC-compliance_June-2025__.pdf\"> Submission of six-monthly compliance report of conditions stipulated in CRZ recommendation issued by the GCZMA, Gujarat for \u201cDevelopment of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">64<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>04\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-5203-VII-IEC-Compliance106.pdf\">Submission of six-monthly compliance report of conditions stipulated in Environmental Clearance granted by the MoEF&amp;CC, GoI for \u201cProposed Smart Industrial Port City (SIPC) at green field site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch-Gujarat by Deendayal Port Authority (Erstwhile: Deendayal Port Trust)&#8221; &#8211; reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">65<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>04\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-5203-VIII-EC-Compliance-107.pdf\">Submission of Six Monthly compliance report of conditions stipulated in NOC\/CTE issued by GPCB, GoG for \u201cProposed Smart Industrial Port City (SIPC) at Green Field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch &#8211; Gujarat by M\/s Deendayal Port Authority (Erstwhile: Kandla Port Trust)&#8221;<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">66<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>05\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-4751-Part-Ro-Pax-Complaince-report-of-EC-CRZ-Clearance-Bifurcation-of-600-mt.-04.12.2025.pdf\">Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M\/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat &#8211; Submission of six-monthly compliance report of conditions stipulated in EC&amp;CRZ Clearance granted by the MoEF&amp;CC, GoI reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">67<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>05\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-4571-Part-Ro-Pax-Complaince-report-of-CRZ-recommendation-Bifurcation-of-600-mt.-04.12.2025.pdf\">Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M\/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat &#8211; Submission of six-monthly compliance report of conditions stipulated in CRZ recommendation granted by the GCZMA, GoG reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">68<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>06\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-5203D-VIII-EC-compliance-SIPC-1_December-2025-1.pdf\">Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side-Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch-Gujarat by M\/s Kandla Port Trust (Deendayal Port Authority) &#8211; Compliance Report of conditions stipulated in Environmental Clearance reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">69<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">\n<p>10\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EGWK4751Part-Stage-II-114-EC-dt-09.12.2025.pdf\">Developing Integrated facilities (Phase-II)- within the existing Kandla Port at Kandla Dist: Kutch by M\/s. Kandla Port Trust \u2013 1. Setting up of Oil Jetty No.7; 2. Setting up of Barge jetty at Jafarwadi; 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by Deendayal Port Authority (Erstwhile Deendayal Port Trust)&#8221; reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"width: 12.5%; height: 72px;\">70<\/td>\n<td style=\"width: 21.5625%; height: 72px;\">\n<p>10\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 72px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EGWK4751Part-Stage-II-116-CRZ-Recommendation-dt-09.12.2025_.pdf\">Submission of six-monthly compliance status report for CRZ Clearnce for Developing Integrated facilities (Phase-II)- within the existing Kandla Port at Kandla Dist: Kutch by M\/s. Kandla Port Trust \u2013 Regarding<\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"width: 12.5%; height: 192px;\">71<\/td>\n<td style=\"width: 21.5625%; height: 192px;\">\n<p>10\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 192px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EGWK4751Part-Stage-II-115-NOC-dt-09.12.2025.pdf\">Submission of six monthly compliance report of conditions stipulated in NOC\/CTE issued by the GPCB, GoG for &#8220;Developing Integrated facilities (Phase-II)- within the existing Kandla Port at Kandla Dist: Kutch by M\/s. Kandla Port Trust \u2013 1. Setting up of Oil Jetty No.7; 2. Setting up of Barge jetty at Jafarwadi; 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by Deendayal Port Authority (Erstwhile Deendayal Port Trust)&#8221; reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">72<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>12\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-4712-Part-II-118-dated-12.12.2025-SPM-EC-CRZ-Compliances.pdf\">Setting up of Single Point Mooring (SPM) and Allied Facilities off-Veera in Gulf of Kutch for handling Crude oil on BOT basis \u2013 Six Monthly compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance &amp; Monitoring Data Sheet reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">73<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>12\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-5202-d-PART-CRZ2-119-Dated-12.12.2025-SPM-CRZ-Recommendation.pdf\">Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M\/s. Kandla Port Trust (Now Deendayal Port Authority)\u2013 Six monthly compliance report of conditions stipulated in CRZ Recommendations reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">74<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>17\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/CN-WK-1600-A-EC-CRZ-Clearance-Onwards-Pipavav-122.pdf\">Submission of Six-monthly compliance report of conditions stipulated in EC &amp; CRZ Clearance granted by the SEIAA, Gujarat for &#8220;Development of Setting up of RoRo\/RoPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority&#8221;-reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">75<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>17\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/CN-WK-1600-A-EC-CRZ-Clearance-Onwards-Pipavav-123.pdf\">Submission of Six-monthly compliance report of conditions stipulated in CRZ Clearance granted by GCZMA, Gujarat for &#8220;Development of Setting up of RoRo\/RoPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority&#8221; &#8211; reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">76<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>20\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-4600EC-PART-V-127-CB-13th-to-16th-EC-Compliance.pdf\">Construction of 13th to 16th Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance and Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"width: 12.5%; height: 72px;\">77<\/td>\n<td style=\"width: 21.5625%; height: 72px;\">\n<p>20\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 72px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EG-WK-4600EC-PART-V-128-CB-13th-to-16th-CRZ-Compliance.pdf\">Construction of 13th to 16th Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) Point wise Compliance to the stipulations in CRZ Recommendations req.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">78<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">\n<p>22\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/CN-WK-1600-A-ECCRZ-Clearance-onwards-Muldwarka-129.pdf\">Submission of Six-monthly compliance report of conditions stipulated in EC &amp; CRZ Clearance granted by the SEIAA, Gujarat for &#8220;Development of Setting up of RoRo\/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74\/3 for Onshore area &#8211; 6 Ha, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront &amp; Onshore Facility: 6Ha. Area Development)&#8221; &#8211; reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"width: 12.5%; height: 144px;\">79<\/td>\n<td style=\"width: 21.5625%; height: 144px;\">\n<p>22\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/CN-WK-1600-A-ECCRZ-Clearance-onwards-Muldwarka-130.pdf\">Submission of Six-monthly compliance report of conditions stipulated in CRZ Clearance granted by GCZMA, Gujarat for &#8220;Development of Setting up of RoRo\/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74\/3 for Onshore area -6 Ha, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront &amp; Onshore Facility: 6Ha. Area Development)&#8221; &#8211; reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"width: 12.5%; height: 96px;\">80<\/td>\n<td style=\"width: 21.5625%; height: 96px;\">\n<p>29\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/EC-EG-WK-4751-Part-Revamping-EC-onwards-134-dt.-29.12.2025.pdf\">Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA through modernization of Existing Pipeline network at Oil Jetty Area, Deendayal Port Authority, Kandla \u2013 Environmental &amp; CRZ Clearance reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">81<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>29\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/CRZ-EG-WK-4751-Part-Revamping-EC-onwards-135-dt.-29.12.2025.pdf\">Submission of six-monthly compliance report of conditions stipulated in CRZ Recommendation granted by the GCZMA, GoG for &#8221; Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernisation of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"width: 12.5%; height: 120px;\">82<\/td>\n<td style=\"width: 21.5625%; height: 120px;\">\n<p>29\/12\/2025<\/p>\n<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2025\/12\/CTE-EG-WK-4751-Part-Revamping-EC-onwards-136-dt.-29.12.2025.pdf\">Submission of six-monthly compliance report of conditions stipulated in NOC\/CTE Order issued by the GPCB, GoG for &#8220;Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernisation of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla<\/a><\/td>\n<\/tr>\n<tr style=\"height: 36px;\">\n<th style=\"height: 36px; text-align: left; width: 12.5%;\">Year- 2024<\/th>\n<th style=\"height: 36px; text-align: left; width: 21.5625%;\">\u00a0<\/th>\n<th style=\"height: 36px; text-align: left; width: 99.4297%;\">\u00a0<\/th>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">1<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">01\/01\/2024<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/01\/Setting-up-of-RoRoRoPax-Facility-at-Pipavav-Gujarat-30-12-2023.pdf\">&#8220;Establishment of RoRo\/Ropax Facility at Pipavav Gujarat &#8211; EC &amp; CRZ Clearance Reg&#8221;<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">2<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">01\/01\/2024<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/01\/Setting-up-of-RoRoRoPax-Facility-at-Muldwarka-Gujarat-30-12-2023-1.pdf\">&#8220;Establishment of RoRo\/Ropax Facility at Muldwarka, Gujarat &#8211; EC and CRZ Clearance Reg&#8221;<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"height: 96px; width: 12.5%;\">3<\/td>\n<td style=\"height: 96px; width: 21.5625%;\">03\/01\/2024<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/01\/EC-Letter-ECL_AUTH_9053P9_IA_GJ_NCP_280634_2018.pdf\">Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA through modernization of Existing Pipeline network at Oil Jetty Area, Deendayal Port Authority, Kandla<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">4<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">04\/03\/2024<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/ECCRZ_EG-WK-4751-Part-Comp_26-dated-20.02.2024.pdf\">Submission of 6 month Compliance report of stipulated conditions mentioned in the EC &amp; CRZ Clearance granted by the MoEF&amp;CC, GOI and Monitoring data sheet for &#8220;Development of 7 integrated facilities (Stage I) within existing Deendayal Authority at Kandla.&#8221;<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">5<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">14\/03\/2024<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-4751-Part-3-remaining-facilities-II-33.pdf\">Submission of six-monthly compliance report of conditions stipulated in Consent to Establish (NOC) Order issued by the GPCB, Gujarat for \u201cDevelopment of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust)\u201d reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">6<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">14\/03\/2024<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-4751-Part-3-remaining-facilities-II-31.pdf\">Submission of six-monthly compliance report of conditions stipulated in EC &amp; CRZ Clearance granted by the MoEF&amp;CC, GoI for \u201cDevelopment of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust)\u201d reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 184px;\">\n<td style=\"height: 184px; width: 12.5%;\">7<\/td>\n<td style=\"height: 184px; width: 21.5625%;\">14\/03\/2024<\/td>\n<td style=\"height: 184px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-4751-Part-3-remaining-facilities-II-32.pdf\">Submission of six-monthly compliance report of conditions stipulated in CRZ recommendation issued by the GCZMA, Gujarat for \u201cDevelopment of 3 Remaining Integrated Facilities (stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust)\u201d reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 112px;\">\n<td style=\"height: 112px; width: 12.5%;\">8<\/td>\n<td style=\"height: 112px; width: 21.5625%;\">15\/03\/2024<\/td>\n<td style=\"height: 112px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/OJ-7-CCA-Complaince-EG-WK-4751-part-II-34-dated-15.03.2024.pdf\">Submission of compliance report of stipulated conditions mentioned in the CCA order issued by the GPCB reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 160px;\">\n<td style=\"height: 160px; width: 12.5%;\">9<\/td>\n<td style=\"height: 160px; width: 21.5625%;\">19\/03\/2024<\/td>\n<td style=\"height: 160px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-4751-Part-Ro-Pax-35.pdf\">Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M\/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat &#8211; Submission of Compliance Report of Stipulated Conditions reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 184px;\">\n<td style=\"height: 184px; width: 12.5%;\">10<\/td>\n<td style=\"height: 184px; width: 21.5625%;\">19\/03\/2024<\/td>\n<td style=\"height: 184px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-4751-Part-Ro-Pax-36.pdf\">Bifurcation (600 mt waterfront out of total 4800 mt) of Environmental and CRZ clearance issued to M\/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat &#8211; Submission of Compliance Report of Stipulated Conditions in CRZ recommendation reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 160px;\">\n<td style=\"height: 160px; width: 12.5%;\">11<\/td>\n<td style=\"height: 160px; width: 21.5625%;\">19\/03\/2024<\/td>\n<td style=\"height: 160px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-4660-EC-Part-V-37.pdf\">&#8220;Construction of 13h to 16th Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance and Monitoring Report in Data Sheet reg<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 136px;\">\n<td style=\"height: 136px; width: 12.5%;\">12<\/td>\n<td style=\"height: 136px; width: 21.5625%;\">19\/03\/2024<\/td>\n<td style=\"height: 136px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-4660-EC-Part-V-38.pdf\">&#8220;Construction of 13th to 16h Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Point wise Compliance to the stipulations in CRZ Recommendations reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 208px;\">\n<td style=\"height: 208px; width: 12.5%;\">13<\/td>\n<td style=\"height: 208px; width: 21.5625%;\">19\/03\/2024<\/td>\n<td style=\"height: 208px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-5203-D-VIII-EC-Compliance-39.pdf\">Proposed Smart Industrial Port City (SIPC) at green Field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch &#8211; Gujarat by M\/s Deendayal Port Authority (Erstwhile: M\/s Kandla Port Trust) &#8211; Six Monthly compliance Report of conditions stipulated In Environmental Clearance &amp; Monitoring Report In Data Sheet reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 160px;\">\n<td style=\"height: 160px; width: 12.5%;\">14<\/td>\n<td style=\"height: 160px; width: 21.5625%;\">19\/03\/2024<\/td>\n<td style=\"height: 160px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-5203-D-VIII-EC-Compliance-40.pdf\">Proposed Smart Industrial Port City (SIPC) at green Field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch &#8211; Gujarat by M\/s Kandla Port Trust &#8211; Six Monthly compliance Report of conditions stipulated in NOC\/CTE Order reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 208px;\">\n<td style=\"height: 208px; width: 12.5%;\">15<\/td>\n<td style=\"height: 208px; width: 21.5625%;\">28\/03\/2024<\/td>\n<td style=\"height: 208px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-5202-part-CRZ-44-Submission-of-CRZ-Complaince-28.03.2024.pdf\">\u00a0CRZ Clearance for &#8220;Creation of water front facilities (Oil Jetties 8,9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority&#8221; &#8211; Submission of six monthly Compliances of the stipulated conditions in CRZ Recommendations reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 232px;\">\n<td style=\"height: 232px; width: 12.5%;\">16<\/td>\n<td style=\"height: 232px; width: 21.5625%;\">28\/03\/2024<\/td>\n<td style=\"height: 232px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-5202-Part-CRZ-43-EC-and-CRZ-Complaince-OJ-8-to-11-28.03.2024.pdf\">Creation of water front facilities (Oil Jetties 8, 9, 10 &amp; area 11)a nd development of land of 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Trust &#8211; Environmental &amp; CRZ Clearance Six Monthly Compliance report for the stipulated conditions in EC&amp;CRZ Clearance Submission of and Monitoring Report in Data sheet reg.<\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 208px;\">\n<td style=\"height: 208px; width: 12.5%;\">17<\/td>\n<td style=\"height: 208px; width: 21.5625%;\">28\/03\/2024<\/td>\n<td style=\"height: 208px; width: 99.4297%;\">\n<p><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/03\/EG-WK-4684-EC-Part-VII-45-CTE-Complaince-28.03.2024.pdf\">&#8220;Creation of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) and development of land of area 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust)- Submission of Point-wise Compliance of Conditions stipulated in the NOC\/CTE reg. <\/a><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">18<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">01\/07\/2024<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/CN-WK-1600-A-EC-CRZ-Clearance-onwards-Pipavav-80.pdf\">Development of Setting up of RoRo\/RoPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority &#8211; Pointwise compliances of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">19<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">01\/07\/2024<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/CN-WK-1600-A-EC-CRZ-Clearance-onwards-Pipavav-79.pdf\">Development of Setting up of RoRo\/RoPax Facility at Pipavav, Gujarat, Rajula, Amreli by Deendayal Port Authority &#8211; Pointwise Compliances of the conditions stipulated in the CRZ recommendation reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"height: 192px; width: 12.5%;\">20<\/td>\n<td style=\"height: 192px; width: 21.5625%;\">05\/07\/2024<\/td>\n<td style=\"height: 192px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/CN-WK-1600-A-EC-CRZ-Clearance-onwards-Muldwarka-84.pdf\"> Development of Setting up of RoRo\/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74\/3 for Onshore area -6 Ha, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront &amp; Onshore Facility: 6Ha. Area Development) &#8211; Pointwise compliances of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">21<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">05\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/CN-WK-1600-A-EC-CRZ-onwards-Muldwarka-85.pdf\">Development of Setting up of RoRo\/RoPax Facility at, Muldwarka, Gujarat, by Deendayal Port Authority at Survey No. 74\/3 for Onshore area -6 Ha, Muldwarka, Kodinar, Gir Somnath. (Offshore Facility: 320m waterfront &amp; Onshore Facility: 6Ha. Area Development) &#8211; Pointwise Compliances of the conditions stipulated in the CRZ recommendation reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">22<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">19\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/Submission-of-Annual-return-of-Haz.-waste-in-form-IV-for-FY-2023-24.pdf\">Submission of Annual Returns Hazardous waste (Form IV) (year 2023-24) and Environmental Statement in Form V (2023-24) for Deendayal Port Authority<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">23<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">19\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/Submission-of-Environmental-Statement-form-V-for-the-FY-2023-24-2.pdf\">Submission of Environmental statement in Form V for the financial year 2023-24 reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">24<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">24\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/EG-WK-4600-EC-Part-V-93.pdf\">Construction of 13th to 16th Cargo berths at Kandla by M\/s Deendayal Port Authority(Erstwhile Deendayal Port Trust)- Compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance and Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">25<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">24\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/EG-WK-4600-EC-Part-V-94.pdf\">&#8220;Construction of 13th to 15th Cargo Berths at Kandla&#8221; by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Point wise Compliance to the stipulations in CRZ Recommendations reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">26<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">25\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/EG-WK-4751-part-comp-1-96-complaince-to-GCZMA-recommendation-25.07.2024.pdf\">Development of 7 Integrated facilities (Stage 1) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M\/s Kandla Port Trust Limited&#8221; &#8211; Pointwise Compliances of the conditions stipulated in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">27<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">25\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/EG-WK-4751-part-comp-1-97-Submission-of-NOC-complaince-25.07.2024.pdf\">Development of 7 Integrated facilities (Stage 1) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Pointwise Compliance of the conditions stipulated in NOC (CTE-74334) issued by GPCB reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">28<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">25\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/EG-WK-4751-Part-Comp-1-95-Point-wise-compliances-of-the-ECCRZ-Clearance-25.10.2024-1.pdf\">Development of 7 Integrated facilities (Stage 1) within the existing Kandla Port Trust limit at District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Environmental &amp; CRZ Clearance &#8211; Pointwise Compliances of the conditions stipulated in the EC&amp;CRZ Clearance and Monitoring Report in Datasheet Reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">29<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">29\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/EG-WK-4751-Part-Revamping-EC-Onward-101-Complaince-to-CRZ-recommendation-29.07.2024-2.pdf\">Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernization of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla &#8211; Pointwise Compliances of the conditions stipulated in CRZ recommendation<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 196px; width: 12.5%;\">30<\/td>\n<td style=\"height: 196px; width: 21.5625%;\">30\/07\/2024<\/td>\n<td style=\"height: 196px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/07\/EG-WK-4751-Revamping-CTE-Complaince-29.07.2024.pdf\">Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 23.8 MMTPA Through Modernization of Existing Pipeline Network at Oil Jetty Area, Deendayal Port Trust, Kandla &#8211; Pointwise Compliances of the conditions stipulated in NOC (CTE &#8211; 115467) issued by the GPCB reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">31<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">06\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/EK-WK-4751-Part-revamping-EC-Complaince-29.07.2024.pdf\">Augmentation of Liquid Cargo Handling Capacity from 8 MMTPA to 3.8 MMTPA through Modernization of existing pipeline network at Oil Jetty area Deendayal Port trust, Kandla &#8211; Pointwise Compliance of the conditions stipulated in the EC &amp; CRZ Clearance and Monitoring Report in Datasheet reg. <\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">32<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">09\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/EG-EK-4751-Part-Stage-II-109-CRZ-recommendation-Complaince-Stage-II-int.-facility-09.08.2024.pdf\">Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. ( 1. Setting up of Oil Jetty No.7 2. Setting up of Barge Jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) Compliances of the stipulated conditions in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">33<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">09\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/EG-WK-4751-Stage-II-110-NOC-Complaince-Stage-II-int.-facilities-09.08.2024.pdf\">Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. ( 1. Setting up of Oil Jetty No.7 2. Setting up of Barge Jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">34<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">09\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/EG-WK-4712-Stage-II-ECCRZ-Complaince-Stage-II-int.-facilities-09.08.2024.pdf\">Development of Integrated facilities (Stage II) within the existing Deendayal Port Trust (Erstwhile Kandla Port Trust) at District Kutch, Gujarat. ( 1. Setting up of Oil Jetty No.7 2. Setting up of Barge Jetty at Jafarwadi 3. Setting up of Barge port at Veera; 4. Administrative office building at Tuna Tekra; 5. Road connecting from Veera barge jetty to Tuna gate by M\/s Deendayal Port Authority (Erstwhile Deendayal Port Trust) &#8211; Six Monthly compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance &amp; Monitoring Report in Data Sheet Reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">35<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">09\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/Final-EC-CRZ-WK-5202-D-part-111-1.pdf\">Environment &amp; CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M\/s Deendayal Port Trust &#8211; Compliance of stipulated conditions mentioned in the Environmental &amp; CRZ Clearance reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">36<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">09\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/Final-CRZ-EG-WK-5202-D-Part-112.pdf\">Environment &amp; CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M\/s Deendayal Port Trust (Erstwhile : Deendayal Port Trust) &#8211; Compliance of stipulated conditions mentioned in the Environmental &amp; CRZ Clearance reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">37<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">13\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/EG-WK-5202-D-Part-CRZ-113-EC-and-CRZ-Complaince-OJ-8-to-11-12.08.2024.pdf\">Creation of water front facilities (Oil jetties 8,9,10 &amp; 11) and development of land of are 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Trust &#8211; Environmental &amp; CRZ Clearance &#8211; Submission of Six Monthly Compliance report for the stipulated conditions in EC&amp;CRZ Clearance and Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">38<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">13\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/EG-WK-EC-Part-VII-114-NOC-Complaince-OJ-8-to-11-12.08.2024.pdf\">Creation of water front facilities (Oil jetties 8,9,10 &amp; 11) and development of land of are 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority (Erstwhile: Deendayal Port Trust) &#8211; Submission of Point-wise Compliance of conditions stipulated in the NOC\/CTE reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">39<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">13\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/EG-WK-5202-D-Part-CRZ-115-CRZ-Complaince-OJ-8-to-11-12.8.2024.pdf\">Creation of water front facilities (Oil jetties 8,9,10 &amp; 11) and development of land of are 554 acres for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority &#8211; Submission of Six monthly Compliances of the stipulated conditions in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 198px; width: 12.5%;\">40<\/td>\n<td style=\"height: 198px; width: 21.5625%;\">23\/08\/2024<\/td>\n<td style=\"height: 198px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/08\/Complaince-to-stipulated-condition-mentioned-in-CCA-order-21.08.2024.pdf\">Consolidated Consent &amp; Authorization (Renewal) order no AWH-110594 date of issue 22\/01\/2021 (GPCB ID 28494) &#8211; submission of compliance report of stipulated conditions mentioned in the CCA Order issued by the GPCB reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">41<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">02\/09\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/09\/EG-WK-5202-D-Part-CRZ-2-124.pdf\">Single Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch for handling crude oil on BOT basis in the state of Gujarat by M\/s. Kandla Port Trust (Now Deendayal Port Authority) &#8211; Six monthly compliance report of conditions stipulated in CRZ Recommendations reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">42<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">02\/09\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/09\/EG-WK-4712-Part-II-123.pdf\">Setting up of Single Point Mooring (SPM) and Allied Facilities off-Veera in Gulf of Kutch for handling Crude oil on B0T basis Six Monthly Compliance Report of conditions stipulated in Environmental &amp; CRZ Clearance &amp; Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">43<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">05\/09\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/09\/EG-WK-5203-D-VIII-EC-Compliance-129.pdf\">Proposed Smart Industrial Port City (SIPC) at green Field Site 1 (Adipur side- Northeast of Antarjaal, South of Tagore Road, 580 Acres), Gandhidham, Kutch &#8211; Gujarat by M\/s Deendayal Port Authority &#8211; Submission of Six- monthly Compliance report for the project reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">44<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">19\/09\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/09\/EG-WK-4751-Part-3-remaining-facilities-II-134.pdf\">Development of 3 Remaining Integrated Facilities (Stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat -Submission of Point-wise Compliances of the stipulated conditions in CRZ Recommendations<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">45<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">19\/09\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/09\/EG-WK-4751-Part-3-remaining-facilities-II-133.pdf\">Development of 3 Remaining Integrated Facilities (Stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat &#8211; Pointwise compliance of the conditions stipulated in the EC&amp;CRZ clearance and Monitoring report in Datasheet Reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">46<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">19\/09\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/09\/EG-WK-4751-Part-3-remaining-facilities-II-135.pdf\">Development of 3 Remaining Integrated Facilities (Stage I) within the existing Deendayal Port Authority (Erstwhile: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat &#8211; Submission of compliance report of stipulated conditions mentioned in the CTE issued by the GPCB reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">47<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">22\/10\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/10\/EG-WK-5203-D-VIII-EC-Compliance-149.pdf\">Proposed Smart Industrial Port City (SIPC) at green field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch &#8211; Gujarat by M\/s Deendayal Port Authority ( Erstwhile: M\/s Kandla Port Trust) &#8211; Six Monthly compliance Report of conditions stipulated in Environmental Clearance &amp; Monitoring Report in Data Sheet reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">48<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">22\/10\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/10\/EG-WK-5203-D-VIII-EC-Compliance-150.pdf\">Proposed Smart Industrial Port City (SIPC) at green field Site 2 (KPT Complex, 850 Acres), Gandhidham, Kutch &#8211; Gujarat by M\/s Kandla Port Trust &#8211; Six Monthly compliance Report of conditions stipulated in NOC\/CTE Order reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">49<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">08\/11\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/11\/Fwd-Submission-of-Annual-Returns-Hazardous-waste-Form-IV-year-2023-24-and-Environmental-Statement-in-Form-V-2023-24-for-CCA-AWH-127510-for-Deendayal-Port-Authority.zip\">Submission of Annual Returns Hazardous waste (Form IV) (year 2023-24) and Environmental Statement in Form V (2023-24) for CCA AWH &#8211; 127510 for Deendayal Port Authority<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">50<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">03\/12\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/12\/EG-WK-4751-Part-Ro-Pax-180.pdf\">Bifurcation ( 600mt waterfront out of total 4800mt) of Environmental and CRZ clearance issued to M\/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat &#8211; Submission of Compliance Report of Stipulated Conditions.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 196px;\">\n<td style=\"height: 206px; width: 12.5%;\">51<\/td>\n<td style=\"height: 206px; width: 21.5625%;\">03\/12\/2024<\/td>\n<td style=\"height: 206px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2024\/12\/EG-WK-4751-Part-Ro-Pax-181.pdf\">Bifurcation ( 600mt waterfront out of total 4800mt) of Environmental and CRZ clearance issued to M\/s Essar Bulk Terminal Limited for Expansion of Port Facility at Hazira, Surat, Gujarat &#8211; Submission of Compliance Report of Stipulated Conditions in CRZ recommendation.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 24px;\">\n<td style=\"width: 12.5%; height: 24px;\">\u00a0<\/td>\n<td style=\"width: 21.5625%; height: 24px;\">\u00a0<\/td>\n<td style=\"width: 99.4297%; height: 24px;\">\u00a0<\/td>\n<\/tr>\n<tr style=\"height: 36px;\">\n<th style=\"height: 36px; width: 12.5%;\">Year- 2023<\/th>\n<th style=\"height: 36px; width: 21.5625%;\">\u00a0<\/th>\n<th style=\"height: 36px; width: 99.4297%;\">\u00a0<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr style=\"height: 216px;\">\n<td style=\"height: 216px; width: 12.5%;\">1<\/td>\n<td style=\"height: 216px; width: 21.5625%;\">10\/02\/2023<\/td>\n<td style=\"height: 216px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/02\/Final-EC-EG-WK-5203D-VIII-EC-comp-233.pdf\">Point-wise compliance of conditions stipulated in the Environmental Clearance accorded by Ministry of Environment and Forests, Government of India vide letter dated 10.10.2017 for Smart Industrial Port City (SIPC) Green Field Site 1 (Adipur side of the Internet, South of Tagore Road, 580 acres), Gandhidham, Kutch-Gujarat for the proposed Smart Industrial Port City (SIPC) project by M\/s Deendayal Port Authority.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">2<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">10\/02\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/02\/Final-CTE-EG-WK-5203D-VIII-234.pdf\">Point-wise compliance of conditions stipulated in the Consent (NOC) for Smart Industrial Port City (SIPC) project at Green Field Site 1 (North-East of Adipur Side-Antarjal, 580 acres), Gandhidham, Kutch, Gujarat-370 201 by M\/s Deendayal Port Authority.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">3<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">10\/02\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/02\/Final-CRZ-EG-WK-5202-D-Part-CRZ-2-228.pdf\">Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for handling crude oil on BOT basis in the State of Gujarat by M\/s Kandla Port Trust (now Deendayal Port Authority) &#8211; Six monthly compliance reports of conditions stipulated in CRZ recommendations<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">4<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">10\/02\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/02\/Final-EC-CRZ-EG-WK-4712-Part-II-227.pdf\">Establishment of Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for management of crude oil on BOT basis &#8211; Environment in Data Sheet Reg and six monthly compliance reports of conditions stipulated in CRZ clearance and monitoring report.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">5<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">11\/02\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/02\/Final-CTE-EG-WK-4660-EC-Part-V-232.pdf\">Compliance with the conditions stipulated in the Concurrence Establishment (NOC) issued by Gujarat Pollution Control Board, GoG for the proposal for &#8220;Construction of 13th to 16th Cargo Berth&#8221; at Deendayal Port Authority (Kandla Port Trust).<\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"height: 72px; width: 12.5%;\">6<\/td>\n<td style=\"height: 72px; width: 21.5625%;\">11\/02\/2023<\/td>\n<td style=\"height: 72px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/02\/Final-CRZ-EG-WK-4660-EC-Part-V-231.pdf\">Construction of 13th to 16th Cargo Berth at Deendayal Port Authority \u2013 Point-wise compliance of conditions in CRZ recommendations<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">7<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">11\/02\/2023<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/02\/Final-EC-EG-WK-4660-EC-Part-V-230_merged-EC.pdf\">Compliance with conditions stipulated in the Environment &amp; CRZ clearance granted by MoEF&amp;CC, Government of India for &#8220;Construction of 13th to 16th Cargo Berth&#8221; at Deendayal Port Authority (Predecessor: Deendayal Port Trust).<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">8<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">11\/02\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/02\/Final-EC-CRZ-WK-5202-D-part-224_compressed.pdf\">Environmental and CRZ clearance &#8211; Environment and CRZ clearance &#8211; Furnishing of information for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"height: 72px; width: 12.5%;\">9<\/td>\n<td style=\"height: 72px; width: 21.5625%;\">02\/05\/2023<\/td>\n<td style=\"height: 72px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/NOC_EG-WK-4751-Part-Comp-1_288-dated-20-4-2023-1.pdf\">Development of 7 integrated facilities (Stage I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Limited<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">10<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">02\/05\/2023<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/NOC_EG-WK-4751-Part-Comp-1_288-dated-20-4-2023-2.pdf\" target=\"_blank\" rel=\"noopener\">Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Point wise compliance of conditions stipulated in NOC (CTE- 74334) issued by GPCB<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">11<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">02\/05\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/EC-CRZ_EG-WK-4751-Part-Comp-1_286-dated-2042023.pdf\" target=\"_blank\" rel=\"noopener\">Development of 7 Integrated Facilities (Stage I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Ltd. &#8220;Environment &amp; CRZ Clearance &#8211; Point wise compliance of conditions stipulated in EC &amp; CRZ Clearance and Monitoring Report Data Sheet.&#8221;<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">12<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">02\/05\/2023<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/CRZ_EG-WK-4751-Part-Comp-1_287-dated-2042023.pdf\" target=\"_blank\" rel=\"noopener\">Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Pot Trust Ltd. &#8211; Point wise compliance of conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 264px;\">\n<td style=\"height: 264px; width: 12.5%;\">13<\/td>\n<td style=\"height: 264px; width: 21.5625%;\">23\/05\/2023<\/td>\n<td style=\"height: 264px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/Compliance-of-CRZ-recommendations_EG-WK-4751-EC-Stage-II_292-dated-03052023.pdf\" target=\"_blank\" rel=\"noopener\">Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in District Kutch, Gujarat (Stage-II). (1. Establishment of Oil Jetty No. 7.) 2. Establishment of Barge Jetty at Jafarwadi 3. the establishment of the barge port in Vira; 4. Administrative office building in Tuna Tekra; 5. Road connecting Veera Barge Jetty to Tuna: Point wise compliance of conditions stipulated in GATE-CRZ recommendation by M\/s Deendayal Port Authority (erstwhile Deendayal Port Trust).<\/a><\/td>\n<\/tr>\n<tr style=\"height: 264px;\">\n<td style=\"height: 264px; width: 12.5%;\">14<\/td>\n<td style=\"height: 264px; width: 21.5625%;\">23\/05\/2023<\/td>\n<td style=\"height: 264px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/Compliance-of-EC-CRZ_EG-WK-4751-EC-Stage-II_291-dated-03052023.pdf\" target=\"_blank\" rel=\"noopener\">Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in District Kutch, Gujarat (Stage II) (1. Establishment of Oil Jetty No. 7 2. Establishment of Barge Jetty at Jaffrabadi 3. Establishment of Barge Port at Vira 4. Administrative Office Building at Tuna Tekra 5. Road leading from Veera Barge Jetty to Tuna Gate by M\/s Deendayal Port Authority (erstwhile Deendayal Port Trust) &#8211; EC &amp; CRZ Clearance &amp; Monitoring Report Point-wise compliance of conditions stipulated in the datasheet<\/a><\/td>\n<\/tr>\n<tr style=\"height: 264px;\">\n<td style=\"height: 264px; width: 12.5%;\">15<\/td>\n<td style=\"height: 264px; width: 21.5625%;\">23\/05\/2023<\/td>\n<td style=\"height: 264px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/Compliance-of-CTE_EG-WK-4751-EC-Stage-II_290-dated-03052023.pdf\" target=\"_blank\" rel=\"noopener\">Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in District Kutch, Gujarat (Stage II) (1. Establishment of Oil Jetty No. 7 2. Establishment of Barge Jetty at Jafrabadi 3. Establishment of Barge Port at Vira 4. Administrative Office Building at Tuna Tekra 5. Road leading from Veera Barge Jetty to Tuna Gate by M\/s Deendayal Port Authority (erstwhile Deendayal Port Trust) &#8211; Prescribed in NOC\/CTE issued by GPCB Point-wise compliance of conditions<\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"height: 192px; width: 12.5%;\">16<\/td>\n<td style=\"height: 192px; width: 21.5625%;\">23\/05\/2023<\/td>\n<td style=\"height: 192px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/CTE-compliance_EG-WK-4684-EC-Part-VII_297-dated-05052023-1.pdf\" target=\"_blank\" rel=\"noopener\">Construction of water front facilities (Oil Jetty 8, 9, 10 &amp; 11) for associated facilities for storage by M\/s Deendayal Port Authority (Ex: Deendayal Port) and development of land of area of 554 acres at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority (Ex: Deendayal Port) &#8211; Submission of point-wise compliance of conditions stipulated in NOC\/CTE<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">17<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">23\/05\/2023<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/CRZ-compliance_EG-WK-4684-EC-Part-VII-CRZ-2_296-dated-552023_1.pdf\" target=\"_blank\" rel=\"noopener\">&#8220;CRZ Clearance for Construction of Water Front Facilities (Oil Jetty 8, 9, 10 &amp; 11) and Development of Land of 554 Acres of Area&#8221; for associated facilities for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Trust &#8211; submission of six-monthly compliance to conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"height: 192px; width: 12.5%;\">18<\/td>\n<td style=\"height: 192px; width: 21.5625%;\">23\/05\/2023<\/td>\n<td style=\"height: 192px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/05\/EC-Compliance_EG-WK-4684-EC-VII-Part-CRZ_295-dated-552023.pdf\" target=\"_blank\" rel=\"noopener\">Construction of water front facilities (0IL JT 8, 9, 10 &amp; 11) for storage at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Trust and development of land of 554 acres area &#8211; Submission of six monthly compliance reports for conditions stipulated in EC and CRZ Clearance and Monitoring Report in Environment and CRZ Clearance Data Sheet.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">19<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">19\/06\/2023<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/06\/Compliance-of-ECCRZ-EGWK4716ECPart-III-322-dated-19.06.2023.pdf\" target=\"_blank\" rel=\"noopener\">Development of plots for construction of godowns\/godowns (Phase II) at Kandla, Gujarat by Deendayal Port Authority (then: Deendayal Port Trust) &#8211; Compliance. Regarding the report of conditions stipulated in the Environment and CRZ Clearance and Monitoring Report in the Data Sheet (period up to November, 2022).<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">20<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">19\/06\/2023<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/06\/Compliance-of-CTE-EGWK4716ECPart-III-324-dated-19.06.2023.pdf\" target=\"_blank\" rel=\"noopener\">Development of plots for construction of godowns\/godowns (Phase II) at Kandla, Gujarat by Deendayal Port Authority (then: Deendayal Port Trust) &#8211; Regarding compliance report of NOC\/CTE (period upto November, 2022).<\/a><\/td>\n<\/tr>\n<tr style=\"height: 72px;\">\n<td style=\"height: 72px; width: 12.5%;\">21<\/td>\n<td style=\"height: 72px; width: 21.5625%;\">19\/06\/2023<\/td>\n<td style=\"height: 72px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/06\/Fwd-Submission-of-Annual-Returns-Hazardous-waste-Form-IV-year-2022-23-and-Environmental-Statement-in-Form-V-2022-23-for-Deendayal-Port-Authority.zip\" target=\"_blank\" rel=\"noopener\">Regarding submission of annual return of hazardous waste in Form IV and V for the financial year 2022-23.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">22<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">19\/06\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/06\/Compliance-of-CRZ-EGWK4716ECPart-III-323-dated-19.06.2023.pdf\" target=\"_blank\" rel=\"noopener\">Development of plots for construction of godowns\/godowns (Phase II) at Kandla, Gujarat by Deendayal Port Authority (then: Deendayal Port Trust) regarding point-wise compliance of conditions in CRZ recommendation (period upto November 2022).<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">23<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">04\/08\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/EG-WK-5203-D-VIII-EC-Compliance-344.pdf\" target=\"_blank\" rel=\"noopener\">Proposed Smart Industrial Port City (SIPC) Green Field Site 1 (Adipur-northeast side-Antarjal, south of Tagore Road, 580 acres), Gandhidham, Kutch-Gujarat by M\/s Deendayal Port Authority &#8211; Submission of six-monthly compliance report for the project.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">24<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">04\/08\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/EG-WK-5202-D-Part-CRZ-2-345.pdf\" target=\"_blank\" rel=\"noopener\">Single Point Mooring (SPM) and associated facilities off Veera in Gulf of Kutch on BOT basis in the State of Gujarat by M\/s. Kandla Port Trust (now Deendayal Port Authority) &#8211; Six monthly compliance reports of conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">25<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">04\/08\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/EG-WK-4712-Part-II-345.pdf\" target=\"_blank\" rel=\"noopener\">Establishment of Single Point Mooring (SPM) and associated facilities off Veera in Gulf of Kutch for management of crude oil on BOT basis \u2013 six monthly compliance reports of conditions set out in the Environment and CRZ Clearance and Monitoring Report in respect of data sheets.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">26<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">04\/08\/2023<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/EG-WK-5203-D-VIII-EC-Compliance-344-.pdf\" target=\"_blank\" rel=\"noopener\">Proposed Smart Industrial Port City (SIPC) Green Field Site 1 (Adipur-Northeast side) on Internetwork, South of Tagore Road, 580 acres), Gandhidham, Kutch, Gujarat-370 201&#8243; Submission of six-monthly compliance report for the project by M\/s. Deendayal Port Authority- Submission of six-monthly compliance report for the project.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">27<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">07\/08\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/EG-WK-4751-Part-Ro-Pax-346-dated-7-8-2023_CRZ-compliance-report_compressed.pdf\" target=\"_blank\" rel=\"noopener\">Bifurcation of Environment and CRZ clearance (600 mt out of total 4800 mt embankment) issued to M\/s Essar Bulk Terminal Ltd. for expansion of port facility at Hazira, Surat, Gujarat &#8211; submission of compliance report of conditions stipulated in CRZ recommendation.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">28<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">07\/08\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/EG-WK-4751-Part-Ro-Pax-347-dated-7-8-2023_ECCRZ-compliance-report.pdf\" target=\"_blank\" rel=\"noopener\">Environmental and CRZ clearance of bifurcation (600 MT total 4800 MT off shore) issued to M\/s Essar, &#8211; Extension of limited port facility for bulk terminal Hazira, Sura, Gujarat &#8211; Submission of prescribed compliance report Conditions registered in EC and CPZ clearance and monitoring datasheet.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">29<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">07\/08\/2023<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/CCA-Complaince-AWH-110594-08.08.2023.pdf\" target=\"_blank\" rel=\"noopener\">Consolidated Consent and Authorization (Renewal) Order No. AWH-110594 Date of Issue 22\/01\/2021 (GPCB ID 28494) &#8211; Submission of compliance report of stipulated conditions as mentioned in CCA order issued by GPCB.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"height: 96px; width: 12.5%;\">30<\/td>\n<td style=\"height: 96px; width: 21.5625%;\">14\/08\/2023<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/CRZ_CB-13-16_EG-WK-4660-EC-Part-V-351-dated-14-8-23_compressed.pdf\" target=\"_blank\" rel=\"noopener\">Construction of 13th to 16th Cargo Berth at Kandla by M\/s Deendayal Port Authority (erstwhile Deendayal Port Trust) &#8211; Point wise compliance of conditions in CCRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">31<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">14\/08\/2023<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/08\/EcCRZ_CB-13-16_EG-WK-4660-EC-Part-V-350-dated-14-8-23.pdf\" target=\"_blank\" rel=\"noopener\">Construction of 13th to 16th Cargo Berth at Kandla by M\/s Deendayal Port Authority (erstwhile Deendayal Port Trust) &#8211; compliance report of conditions stipulated in Environment and CRZ Clearance and monitoring report in data sheet.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">32<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">12\/09\/2023<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/ECCRZ_EG-WK-4751-Part-3-rem-facilities_358-dated-12-9-23.pdf\" target=\"_blank\" rel=\"noopener\">Development of 3 remaining integrated facilities (Phase I) within the existing Deendayal Port Authority (then: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat &#8211; Point-wise compliance of conditions stipulated in EC &amp; CRZ Clearance and Monitoring Report in respect of Datasheet.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">33<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">12\/09\/2023<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/NOC_EG-WK-4751-Part-Comp_360-dated-12-9-2023_R1.pdf\" target=\"_blank\" rel=\"noopener\">Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Point wise compliance of conditions stipulated in NOC (CTE- 74334) issued by GPCB.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">34<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">12\/09\/2023<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/CRZ_EG-WK-4751-Part-Comp_361-dated-12-9-2023.pdf\" target=\"_blank\" rel=\"noopener\">Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Point wise compliance of conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">35<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">12\/09\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/CTE_EG-WK-4751-Part-3-rem-facilities_356-dated-12-9-23.pdf\" target=\"_blank\" rel=\"noopener\">Development of 3 remaining integrated facilities (Phase I) within the existing Deendayal Port Authority (then: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat, furnishing compliance report of stipulated conditions as mentioned in CTE issued by GPCB.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">36<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">12\/09\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/CRZ_EG-WK-4751-Part-3-rem-facilities_357-dated-12-9-23.pdf\" target=\"_blank\" rel=\"noopener\">Development of 3 remaining integrated facilities (Phase I) within the existing Deendayal Port Authority (then: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat Submission of point-wise compliance to conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">37<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">12\/09\/2023<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/ECCRZ_EG-WK-4751-Part-Comp_359-dated-12-9-2023.pdf\" target=\"_blank\" rel=\"noopener\">Development of 7 integrated facilities (Phase I) within existing Kandla Port Trust limits in District Kutch (Gujarat) by M\/s Kandla Port Trust Limited &#8211; Environment &amp; CRZ Clearance &#8211; Point wise compliance of conditions stipulated in EC &amp; RZ Clearance and Monitoring Report in respect of datasheet.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">38<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">18\/09\/2023<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/EG-EK-5202-part-CRZ-363-dated-18.09.2023-Point-wise-Compliance-CRZ-Recommendation.pdf\" target=\"_blank\" rel=\"noopener\">&#8220;CRZ clearance for development of land of 554 acres area for construction and storage of water front facilities (oil jetty 8, 9, 10 &amp; 11) at Old Kandla, Gandhidham, Kutch, Gujarat by M\/s Deendayal Port Authority&#8221; &#8211; submission of six-monthly compliance to conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"height: 192px; width: 12.5%;\">39<\/td>\n<td style=\"height: 192px; width: 21.5625%;\">18\/09\/2023<\/td>\n<td style=\"height: 192px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/EG-WK-5202-D-Part-Submission-Complaince-of-EC-and-CRZ-Clearance-dated-18.09.2023.pdf\" target=\"_blank\" rel=\"noopener\">Development of land of 554 acres area for construction and storage of water front facilities (0IL JT 8, 9, 10 &amp; 11) at Old Kandla, Gandhidharma, Kutch, Gujarat by M\/s Deendayal Port Trust &#8211; Environment &amp; CRZ Clearance &#8211; Submission of six monthly compliance reports for conditions stipulated in EEC &amp; CRZ Clearance and Monitoring Report in the data sheet.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">40<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">18\/09\/2023<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/09\/EG-WK-EC-Part-VII-Submission-of-Point-wise-complaince-of-NOC-dated-18.09.2023.pdf\" target=\"_blank\" rel=\"noopener\">4\/5 Development of land of 554 acres for construction of water front facilities (Oil Jetty 8, 9, 10 &amp; 11) and related facilities for storage at Old Kandla, Gandhidharan, Kutch, Gujarat by Deendayal Port Authority (then: Deendayal Port Trust) &#8211; Submission of point-wise compliance with the stipulated conditions in respect of NOC\/CTE.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"height: 96px; width: 12.5%;\">41<\/td>\n<td style=\"height: 96px; width: 21.5625%;\">08\/11\/2023<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/11\/EG-WK-5203-D-VIII-EC-Compliance-388.pdf\" target=\"_blank\" rel=\"noopener\">Six monthly compliance reports of conditions stipulated in the NOC\/CTE order at Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch, Gujarat by M\/s Kandla Port Trust.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 54px;\">\n<th style=\"height: 54px; width: 12.5%;\">Year &#8211; 2022<\/th>\n<th style=\"height: 54px; width: 21.5625%;\">\u00a0<\/th>\n<th style=\"height: 54px; width: 99.4297%;\">\u00a0<\/th>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">1<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">03\/02\/2022<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/08Feb2022062249PM.pdf\">Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for handling crude oil on BOT basis in the State of Gujarat by M\/s Kandla Port Trust (now Deendayal Port Authority) &#8211; compliance with conditions stipulated in CRZ recommendations. Report No.: EG\/WK\/5202(D)\/Part (CRZ-2) 134-1<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">2<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">03\/02\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/08Feb2022062533PM.pdf\">Establishment of Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for management of crude oil on BOT basis &#8211; Environment in Data Sheet Reg and six monthly compliance reports of conditions stipulated in CRZ clearance and monitoring report.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">3<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">09\/02\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/09Feb2022055708PM.pdf\">Development of land measuring 554 acres for construction and storage of water front facilities (Oil Jetty 8, 9, 10 &amp; 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority-Submission of six monthly compliance reports of prescribed conditions mentioned.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">4<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">09\/02\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/09Feb2022060142PM.pdf\">Development of land of 554 acres area for construction and storage of water front facilities (oil jetties 8, 9, 10 &amp; 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority-Submission of six monthly compliance reports of conditions stipulated in CRZ recommendation.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">5<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">09\/02\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/09Feb2022060405PM.pdf\">Development of land of 554 acres area for construction and storage of water front facilities (Oil Jetty 8, 9, 10 &amp; 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority &#8211; Submission of six monthly compliance reports of conditions stipulated in EC &amp; CRZ clearance reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 288px;\">\n<td style=\"height: 288px; width: 12.5%;\">6<\/td>\n<td style=\"height: 288px; width: 21.5625%;\">12\/02\/2022<\/td>\n<td style=\"height: 288px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/14Feb2022010143PM.pdf\">Development of Integrated Facilities within the existing Deendayal Port Authority (erstwhile Kandla Port Trust) in Kutch, Gujarat District (Phase II). Installation of oil jetty No. 7. Establishment of Barge Jetty at Jaffrabadi. Establishment of the barge port in Viera 4. Administrative Office Building in Tuna Tekra 5. Road connecting Veera Barge Jetty to Tuna Gate by M\/s Deendayal Port Authority (erstwhile Kandla Port Trust) \u2013 Monitoring Repo in six monthly compliance reports and data sheets of conditions stipulated in Environment and CRZ clearance<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"height: 96px; width: 12.5%;\">7<\/td>\n<td style=\"height: 96px; width: 21.5625%;\">12\/02\/2022<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/14Feb2022010723PM.pdf\">Point-wise Compliance Status Report for CRZ Clearance (Phase-II) for development of integrated facilities within existing Kandla Port in Kandla District of Kutch by M\/s Kandla Port Trust<\/a><\/td>\n<\/tr>\n<tr style=\"height: 216px;\">\n<td style=\"height: 216px; width: 12.5%;\">8<\/td>\n<td style=\"height: 216px; width: 21.5625%;\">12\/02\/2022<\/td>\n<td style=\"height: 216px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/14Feb2022011135PM.pdf\">Development of Integrated Facilities within the existing Deendayal Port Authority (erstwhile Kandla Port Trust) in Kutch District of Gujarat (Phase-II). (1. Establishment of oil jetty No. 7.) 2. Establishment of Barge Jetty at Jaffarwadi. the establishment of the barge port in Vira; 4. Administrative office building in Tuna Tekra; 5. Road connecting Veera Barge Jetty to Tuna Gate by M\/s Deendayal Port Authority (erstwhile Kandla Port Trust)<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">9<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">12\/02\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/08\/14Feb2022011135PM-1.pdf\">CRZ clearance proposed for development of Integrated Facility (Phase-I) &#8211; Remaining three facilities within existing Kandla Port at Kandla, District by M\/s Deendayal Port Authority (Former: Kandla Port Trust) Kutch &#8211; Compliance with conditions stipulated in CRZ recommendations<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">10<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">12\/02\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/14Feb2022012848PM.pdf\">Development of 3 remaining integrated facilities (Phase I) within existing Deendayal Port Authority (Ex: Kandla Port Trust) at Gandhidham, Kutch, Gujarat &#8211; Environment &amp; CRZ clearance &#8211; Submission of compliance report of stipulated conditions.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">11<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">15\/02\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/19Feb2022104538AM.pdf\">Environmental and CRZ clearance &#8211; Environment and CRZ clearance &#8211; Furnishing of information for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">12<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">15\/02\/2022<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/19Feb2022105129AM.pdf\">Environment and CRZ clearance for construction of Interchange Road Over Bridge (ROB) on LC-236 [Kutch Namak Junction] on NH-141 up to Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by Deendayal Port Authority &#8211; NOC\/CRZ Clearance &#8211; NOC\/NOC Compliance with conditions outlined in CTE Reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">13<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">15\/02\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/22Feb2022050739PM.pdf\">Environmental and CRZ clearance for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority &#8211; Environment and CRZ Clearance &#8211; Furnishing of Information<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">14<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">23\/02\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/23Feb2022011925PM.pdf\">Green Field Site 1 (Towards Adipur-North-East of Interweb, South of Tagore Road, 580 acres), Gandhidham, Kutch-Gujarat Proposed by M\/s Kandla Port Trust &#8211; Compliance Report of conditions stipulated in Environmental Clearance<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">15<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">23\/02\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/23Feb2022012134PM.pdf\">Compliance Report (NOC) for establishment of Smart Industrial Port City (SIPC) at Green Field Site 1 (Adipur side of the Internet-North-East, South of Tagore Road, 580 acres), Gandhidham, Kutch, Gujarat-370 201 by M\/s Deendayal Port Authority.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">16<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">05\/04\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/05Apr2022062722PM.pdf\">Bifurcation of Environmental and CRZ clearances (600 MT out of total 4800 MT) issued to M\/s Essar Bulk Terminal Ltd. for expansion of port facility at Hazira, Surat, Gujarat- Transfer of Environment &amp; CRZ clearances- Transfer of Environment &amp; CRZ clearances- Reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">17<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">06\/07\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/06Jul2022121415PM.pdf\">Establishment of Single Point Mooring (SPM) and associated facilities out of Veera in Gulf of Kutch for management of crude oil on BOT basis &#8211; six monthly compliance reports of conditions stipulated in environment and CRZ clearances and monitoring report in data sheets<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">18<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">06\/07\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/06Jul2022121712PM.pdf\">Single Point Mooring (SPM) and associated facilities at Veera in Gulf of Kutch for handling crude oil on BOT basis in the State of Gujarat by M\/s Kandla Port Trust (now Deendayal Port Trust) &#8211; compliance with conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">19<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">07\/07\/2022<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/07Jul2022055312PM.pdf\">Submission of Annual Return in Form IV format for the financial year 2021-22 to hazardous waste.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">20<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">07\/07\/2022<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/07Jul2022055638PM.pdf\">Submission of environmental statement in Form V format for the financial year 2021-22.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">21<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">11\/07\/2022<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/11Jul2022012610PM.pdf\">Environment &amp; CRZ Clearance for Construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority &#8211; NOC\/CRZ Clearance &#8211; NOC\/Kutch Junction Compliance with conditions outlined in CTE Reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">22<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">11\/07\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/11Jul2022053939PM.pdf\">Environmental and CRZ clearance for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Salt Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M\/s Deendayal Port Trust &#8211; Environment and CRZ clearance &#8211; Furnishing of Information<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">23<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">11\/07\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/11Jul2022054138PM.pdf\">Six monthly compliance report of CRZ recommendation for construction of Interchange Road Over Bridge (ROB) at LC-236 [Kutch Namak Junction] on NH-141 upto Nehru Gate of Kandla Port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">24<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">11\/07\/2022<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/11Jul2022054430PM.pdf\">Development of land of 554 acres area for construction and associated facilities for storage of water front facilities (Oil Jetty 8, 9, 10 &amp; 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority &#8211; Submission of six monthly compliance reports of conditions stipulated in CRZ recommendation<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">25<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">11\/07\/2022<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/11Jul2022054809PM.pdf\">Development of land of 554 acres area for construction and associated facilities for storage of water front facilities (Oil Jetty 8, 9, 10 &amp; 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority &#8211; Submission of six monthly compliance reports of conditions stipulated in EC &amp; CRZ clearances<\/a><\/td>\n<\/tr>\n<tr style=\"height: 168px;\">\n<td style=\"height: 168px; width: 12.5%;\">26<\/td>\n<td style=\"height: 168px; width: 21.5625%;\">11\/07\/2022<\/td>\n<td style=\"height: 168px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/11Jul2022055027PM.pdf\">Development of land of 554 acres for construction and associated facilities for storage of water front facilities (Oil Jetties 8, 9, 10 &amp; 11) at Old Kandla, Gandhidham, Kutch, Gujarat by Deendayal Port Authority &#8211; NOC\/NOC Submission of six monthly compliance reports of the prescribed conditions as stated by CTE Reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">27<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">11\/07\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/11Jul2022055411PM.pdf\">Compliance Report (NOC) for establishment of Smart Industrial Port City (SIPC) at Green Field Site 1 (Adipur side of the Internet-North-East, South of Tagore Road, 580 acres), Gandhidham, Kutch, Gujarat-370 201 by M\/s Deendayal Port Authority.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">28<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">11\/07\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/11Jul2022055748PM.pdf\">Compliance report of conditions stipulated in Environment Clearance (EC) reg proposed at Green Field Site 1 (North-East of Adipur-Antarjaal, 580 acres), Gandhidham, Kutch-Gujarat by M\/s Kandla Port Trust.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">29<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">13\/07\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/13Jul2022012236PM.pdf\">Proposed CRZ clearance for development of Integrated Facility (Phase-I) \u2013 remaining three facilities within the existing Kandla Port in Kutch by M\/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) \u2013 compliance with conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">30<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">13\/07\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/13Jul2022014109PM.pdf\">Development of 3 remaining integrated facilities (Phase I) within the existing Deendayal Port Authority (Former: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat &#8211; Environment &amp; CRZ clearance &#8211; Submission of compliance report of stipulated conditions.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">31<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">13\/07\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/13Jul2022014512PM.pdf\">Development of 3 remaining integrated facilities (Phase 1) within the existing Deendayal Port Authority (Ex: Deendayal Port Trust) at Gandhidham, Kutch, Gujarat &#8211; Submission of compliance report of stipulated conditions mentioned in CTE issued by GPCB<\/a><\/td>\n<\/tr>\n<tr style=\"height: 264px;\">\n<td style=\"height: 264px; width: 12.5%;\">32<\/td>\n<td style=\"height: 264px; width: 21.5625%;\">14\/07\/2022<\/td>\n<td style=\"height: 264px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/14Jul2022041710PM.pdf\">Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in Kutch District, Gujarat (Phase II). Installation of oil jetty No. 7. Establishment of Barge Jetty at Jaffrabadi. Establishment of the barge port in Viera 4. Administrative Office Building in Tuna Tekra 5. Road connecting Veera Barge Jetty to Tuna Gate by M\/s Deendayal Port Trust (erstwhile Kandla Port Trust) \u2013 Six monthly compliance reports of conditions stipulated in environment and CRZ clearance and monitoring report in data sheet reg<\/a><\/td>\n<\/tr>\n<tr style=\"height: 288px;\">\n<td style=\"height: 288px; width: 12.5%;\">33<\/td>\n<td style=\"height: 288px; width: 21.5625%;\">14\/07\/2022<\/td>\n<td style=\"height: 288px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/14Jul2022042529PM.pdf\">Development of integrated facilities within the existing Deendayal Port Authority (erstwhile Deendayal Port Trust) in Kutch, Gujarat District (Phase II). Installation of oil jetty No. 7. Establishment of Barge Jetty at Jaffrabadi. Establishment of the barge port in Viera 4. Administrative Office Building in Tuna Tekra 5. Submission of compliance report of the stipulated conditions mentioned in the CTE issued by M\/s Deendayal Port Authority (erstwhile Kandla Port Trust) connecting road from Veera Barge Jetty to Tuna Gate<\/a><\/td>\n<\/tr>\n<tr style=\"height: 264px;\">\n<td style=\"height: 264px; width: 12.5%;\">34<\/td>\n<td style=\"height: 264px; width: 21.5625%;\">14\/07\/2022<\/td>\n<td style=\"height: 264px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/14Jul2022043457PM.pdf\">Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in Kutch District of Gujarat (Phase-II). (1. Establishment of oil jetty No. 7.) 2. Establishment of Barge Jetty at Jaffarwadi. the establishment of the barge port in Vira; 4. Administrative office building in Tuna Tekra; 5. Compliance with the conditions stipulated in the CRZ recommendations on the road connecting Veera Barge Jetty to Tuna Gate by M\/s Deendayal Port Authority (erstwhile Deendayal Port Trust)<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">35<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">14\/07\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/14Jul2022053836PM.pdf\">Consolidated Consent and Authorization (Renewal) Order No. AWH-110594 Date of Issue 22\/01\/2O21 (GPCB ID 28494) &#8211; Submission of compliance report of stipulated conditions as mentioned in CCA order issued by GPCB<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">36<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">22\/07\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/22Jul2022013041PM.pdf\">Construction of 13th to 16th Cargo Berth at Kandla Port by M\/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) &#8211; Submission of compliance report of stipulated conditions mentioned in CTE issued by GPCB.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"height: 96px; width: 12.5%;\">37<\/td>\n<td style=\"height: 96px; width: 21.5625%;\">22\/07\/2022<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/22Jul2022013314PM.pdf\">Construction of 13th to 16th cargo berth at Kandla Port by M\/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) &#8211; Compliance with conditions stipulated in CRZ recommendations.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">38<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">22\/07\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/22Jul2022013612PM.pdf\">Construction of 13th to 16th Cargo Berth at Kandla Port by M\/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) &#8211; Six monthly compliance reports of conditions stipulated in the Environment and CRZ Clearance and Monitoring Report in the Data Sheet.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">39<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">17\/08\/2022<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/17Aug2022062953PM.pdf\">Development of plots for construction of liquid storage tank farm at Kandla, Gujarat by M\/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) &#8211; Environment in Data Sheet Reg and point-wise compliance report of conditions stipulated in CRZ clearance and monitoring report.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">40<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">17\/08\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/17Aug2022064700PM.pdf\">Development of plots for construction of Liquid Storage Tank Farm at Kandla, Gujarat by M\/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) &#8211; Point wise compliance report of conditions stipulated in CRZ recommendation.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">41<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">17\/08\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/17Aug2022064849PM.pdf\">Development of plots for construction of Liquid Storage Tank Farm at Kandla, Gujarat by M\/s Deendayal Port Authority (Predecessor: Deendayal Port Trust) &#8211; Point wise compliance report of conditions stipulated in NOC issued by GPCB.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 192px;\">\n<td style=\"height: 192px; width: 12.5%;\">42<\/td>\n<td style=\"height: 192px; width: 21.5625%;\">23\/08\/2022<\/td>\n<td style=\"height: 192px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/23Aug2022010130PM.pdf\">Point-wise compliance report of conditions stipulated in Environmental Clearance and Monitoring Report in Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch-Gujarat proposed by M\/s Deendayal Port Authority (erstwhile Deendayal Port Trust) at Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch-Gujarat.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 120px;\">\n<td style=\"height: 120px; width: 12.5%;\">43<\/td>\n<td style=\"height: 120px; width: 21.5625%;\">23\/08\/2022<\/td>\n<td style=\"height: 120px; width: 99.4297%;\"><a href=\"http:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2022\/11\/23Aug2022011229PM.pdf\">Point-wise compliance report of conditions stipulated in NOC issued by GPCB at Green Field Site 2 (KPT Complex, 850 acres), Gandhidham, Kutch-Gujarat by M\/s Deendayal Port Authority (erstwhile Deendayal Port Trust).<\/a><\/td>\n<\/tr>\n<tr style=\"height: 54px;\">\n<th style=\"height: 54px; width: 12.5%;\">Year &#8211; 2020<\/th>\n<th style=\"height: 54px; width: 21.5625%;\">\u00a0<\/th>\n<th style=\"height: 54px; width: 99.4297%;\">\u00a0<\/th>\n<\/tr>\n<tr style=\"height: 96px;\">\n<td style=\"height: 96px; width: 12.5%;\">1<\/td>\n<td style=\"height: 96px; width: 21.5625%;\">18\/02\/2020<\/td>\n<td style=\"height: 96px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/04\/EC-CRZ-Clearance-ggranted-by-MoEFCCGoI-for-remaining-3-facilities-18-2-2020-2.pdf\">Development of 3 remaining integrated facilities (Phase I) within existing Kandla Port Trust at Gandhidham, Kutch, Gujarat by M\/s Kandla Port Trust &#8211; Environment and CRZ clearance &#8211; Reg.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 240px;\">\n<td style=\"height: 240px; width: 12.5%;\">2<\/td>\n<td style=\"height: 240px; width: 21.5625%;\">19\/02\/2020<\/td>\n<td style=\"height: 240px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/04\/EC-CRZ-Clearance-Dev-Integarted-Facilities-stage-II-19-2-2020-2.pdf\">Development of Integrated Facilities within the existing Deendayal Port Trust (erstwhile Kandla Port Trust) in Kutch District of Gujarat (Phase-II). (1. Establishment of oil jetty No. 7.) 2. Establishment of Barge Jetty at Jaffarwadi. the establishment of the barge port in Vira; 4. Administrative office building in Tuna Tekra; 5. Road connecting Veera Barge Jetty to Tuna Gate by M\/s Deendayal Port Trust (erstwhile Kandla Port Trust) &#8211; Environment &amp; CRZ Clearance<\/a><\/td>\n<\/tr>\n<tr style=\"height: 144px;\">\n<td style=\"height: 144px; width: 12.5%;\">3<\/td>\n<td style=\"height: 144px; width: 21.5625%;\">24\/11\/2020<\/td>\n<td style=\"height: 144px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/04\/EC-CRZ-Clearnce-OJ-8-to-11-issued-by-MoEFCC-on-20-11-2020-2.pdf\">Expansion of the port by M\/s Deendayal Port Trust (earlier known as Kandla Port Trust) by developing land of 554 acres for construction of water front facilities (Oil Jetty 8,9,10 &amp; 11) and associated facilities for storage at Old Kandla, Gandhidham, Kutch (Gujarat) &#8211; Environment &amp; CRZ Clearances.<\/a><\/td>\n<\/tr>\n<tr style=\"height: 54px;\">\n<th style=\"height: 54px; width: 12.5%;\">Year &#8211; 2016<\/th>\n<th style=\"height: 54px; width: 21.5625%;\">\u00a0<\/th>\n<th style=\"height: 54px; width: 99.4297%;\">\u00a0<\/th>\n<\/tr>\n<tr style=\"height: 48px;\">\n<td style=\"height: 48px; width: 12.5%;\">1<\/td>\n<td style=\"height: 48px; width: 21.5625%;\">20\/12\/2016<\/td>\n<td style=\"height: 48px; width: 99.4297%;\"><a href=\"https:\/\/www.deendayalport.gov.in\/wp-content\/uploads\/2023\/04\/EC-CRZ-Clearance-7-Integarted-Facilities-19-12-2016-2.pdf\">Development of 7 integrated facilities (Phase-I) within existing Kandla Port<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Port Environment Sr. No.\u00a0 Date of issue Subject Year- 2026 \u00a0 \u00a0 1 08\/01\/2026 Environment &amp; CRZ Clearance for the Construction of Interchange cum Road Over Bridge (ROB) at LC-236 [Kutch salt junction] on N.H-141 to Nehru gate of Kandla port, Gandhidham, Kutch proposed by M\/s Deendayal Port Authority &#8211; Environmental &amp; CRZ Clearance &#8211; Submission of Six Monthly Compliance of conditions stipulated in EC CRZ Clearance 2 08\/01\/2026 CRZ Clearance for proposed construction of &hellip; <a href=\"https:\/\/www.deendayalport.gov.in\/en\/downloads\/port-environment-1\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":507,"menu_order":190,"comment_status":"closed","ping_status":"closed","template":"","meta":{"episode_type":"","audio_file":"","cover_image":"","cover_image_id":"","duration":"","filesize":"","date_recorded":"","explicit":"","block":"","filesize_raw":""},"_links":{"self":[{"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages\/37354"}],"collection":[{"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/comments?post=37354"}],"version-history":[{"count":128,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages\/37354\/revisions"}],"predecessor-version":[{"id":40466,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages\/37354\/revisions\/40466"}],"up":[{"embeddable":true,"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/pages\/507"}],"wp:attachment":[{"href":"https:\/\/www.deendayalport.gov.in\/en\/wp-json\/wp\/v2\/media?parent=37354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}