Future Projects
Development of Marine liquid terminal facilities, consisting of two berths,
300m each on the North side of existing jetty and a SPM in DPT waters at OOT
Vadinar for handling crude & petroleum products (Expansion by M/s EOL at OOT, Vadinar, DPT).
300m each on the North side of existing jetty and a SPM in DPT waters at OOT
Vadinar for handling crude & petroleum products (Expansion by M/s EOL at OOT, Vadinar, DPT).
Setting up of Mega-Container Terminal of 2.19 MTEUs capacity at Tuna Tekra,
Deendayal Port, on BOT Basis under PPP mode at an estimated cost of Rs 3,097 crores.
Deendayal Port, on BOT Basis under PPP mode at an estimated cost of Rs 3,097 crores.
Up-gradation of the road network of 66 hectares renamed as
(up-gradation of kutcha plots of 66 hectares).
(up-gradation of kutcha plots of 66 hectares).
Modification, Strengthening and Up-gradation of Multipurpose Dry Cargo
Berth No. 7 to 10 at Deendayal Port.
Berth No. 7 to 10 at Deendayal Port.
Development of 14th & 16th multi-purpose Cargo Berth through internal resources.
Construction of ROB at Kutch Salt Junction (LC 236).
Setting up of a new Dry dock / ship repair facility at Deendayal Port